
Commercial And Industrial ESS
Liquid-cooled all-in-one 215 kWh and 232 kWh cabinets integrating LFP battery, BMS, PCS, EMS, thermal control and fire protection.

Two all-in-one cabinets for commercial and industrial storage: 215 kWh at 768V nominal and 232 kWh at 832V nominal. Each integrates the LFP battery, a smart BMS, a high-efficiency liquid-cooled PCS, the EMS, the liquid-cooling temperature control system, power distribution and fire protection in one enclosure, and each parallels with more units for larger capacity. Liquid cooling holds the temperature difference between cells inside a pack below 2.5 degrees Celsius, which the product data credits with increasing life by 30% and cutting energy consumption by 20%.
What This Group Is Built To Solve
Air-cooled commercial storage ages unevenly. Cells in the middle of a rack run hotter than the ones at the edge, capacity drifts apart, and the whole cabinet gets limited by its weakest string. Liquid cooling attacks that directly by keeping the temperature spread inside the pack under 2.5 degrees Celsius, and the all-in-one design removes the integration work of matching a PCS, an EMS and a fire system from three suppliers on site.
Who This Range Is For
C&I Energy Users
Factories, logistics parks and commercial buildings shaving peak demand or shifting load to cheap tariff windows.
EPC Contractors And Developers
Wanting one cabinet with the PCS, EMS and fire protection already integrated and tested together.
Microgrid And Backup Projects
Where grid reliability, not tariff, is the reason the battery is being bought.
What Makes This Range Different
Liquid Cooling With A 2.5 Degree Spread
Temperature difference between cells inside the pack held below 2.5 degrees Celsius, credited with 30% longer life and 20% lower energy consumption.
Everything In One Cabinet
LFP battery, smart BMS, liquid-cooled PCS, EMS, thermal control, power distribution and fire protection, integrated and delivered as one product.
Verified By Destructive Testing
The design has been through short-circuit, burning and fire-resistance testing, per the published product data.
Modular Installation And Parallel Expansion
Add cabinets to raise capacity instead of redesigning the plant room.
Where These Packs Are Used
- Peak shaving and demand charge reduction on industrial sites
- Time-of-use arbitrage for commercial buildings
- Solar self-consumption at factory and warehouse scale
- Microgrids and campus-level backup
- Grid support and capacity firming projects
- EV charging hubs buffering grid connection limits
Sectors That Specify This Group
Commercial And Industrial Energy Storage
Liquid-cooled 215 kWh and 232 kWh all-in-one cabinets, plus 51.2V modular banks for smaller commercial sites.
Telecom And Data Centre Backup
48V rack packs at 50Ah, 100Ah and 200Ah for base stations, exchanges and DC plant, 6000+ cycles, parallel to fifteen units.
Commercial And Industrial ESS Questions
What is the difference between the 215 kWh and the 232 kWh cabinet?
Capacity and bus voltage: 215 kWh at 768V nominal, and 232 kWh at 832V nominal. Both are the same all-in-one liquid-cooled architecture, so the choice is driven by the capacity you need and the PCS sizing behind it.
Do I need to buy the PCS and EMS separately?
No. Both are integrated into the cabinet along with the thermal control, power distribution and fire protection. That is the point of an all-in-one design: one supplier, one commissioning process, one set of interfaces.
Can I install more than one?
Yes. The cabinets support parallel connection for higher capacity, and modular installation is one of the published design features. Send us the site load profile and target capacity and we will size the cabinet count.
How is fire risk handled?
A fire protection system is integrated in the cabinet, and the product has been verified by destructive tests including short circuit, burning and fire resistance. Your local code will still drive siting and clearance - raise it early in the project.
What does liquid cooling actually buy me?
Consistency. Holding the temperature spread between cells below 2.5 degrees Celsius stops the pack ageing unevenly, which is what the published 30% life increase and 20% energy consumption reduction refer to.
What is the lead time on a project like this?
It depends on capacity, configuration and certification for your market. Send the project details on WhatsApp or by email and we will give you a build and shipping schedule rather than a generic figure.
Get A Quotation On Commercial And Industrial ESS
Send the models, the quantities and the destination and we will confirm specification, packing and lead time.

