200 Ton Crane Solution supplied by TrueGlow Imaging
Overhead Cranes

200 Ton Crane Solution

A 200 ton winch double beam overhead crane for construction, heavy manufacturing, shipbuilding, aerospace, metal and mining, power generation and transport work.

200 Ton Crane Solution supplied by TrueGlow Imaging

Product Overview

A 200 ton winch double beam overhead crane for construction, heavy manufacturing, shipbuilding, aerospace, metal and mining, power generation and transport work. Lifting load is 100 to 360 tons over a span range of 0 to 49 metres, with a maximum lifting height of 30 or 40 metres, lifting speed 0.4-20 m/min, long travelling 5-90 m/min and cross travelling 4-40 m/min. Core components are a gearbox, motor and frequency converter, with a European-style electric wire rope hoist. Built in Henan, China with CE and ISO certification and a one year warranty.

Key benefits

Why Buyers Choose This Specification

Full Motion Data Published

Lifting 0.4-20 m/min, long travelling 5-90 m/min and cross travelling 4-40 m/min are all stated, so a handling cycle at 200 tons can be timed on paper before the order.

Sized From 100 Tons Upward

This frame is rated 100 to 360 tons. A 200 ton duty sits in the middle of the range rather than at the edge of a lighter design.

Three Control Formats at Heavy Capacity

Wireless remote control, cab control and handheld control are all offered, so the operating position can follow the application rather than the crane.

Certification and Warranty on Record

CE and ISO certification with a one year warranty and a declared place of origin in Henan, China.

Application scenarios

Where It Is Used

  • Shipbuilding handling major hull blocks
  • Power generation installing turbines, generators and transformers
  • Metal and mining plants moving furnaces and process equipment
  • Aerospace facilities lifting large tooling and structures
  • Heavy manufacturing handling complete fabricated assemblies
  • Transport and logistics moving project cargo
Who it is for

The Buyers This Product Suits

Plants Timing Their Handling Cycles

Published lifting and travelling speeds let production planning calculate crane throughput instead of estimating it.

EPC Contractors

Power generation, metal and mining projects need certified lifting equipment with traceable specification data for the site file.

Shipyards Handling Blocks

A 0 to 49 metre span with 100 to 360 tons of lifting load covers block handling in most building halls.

Problems it solves

What It Fixes

Estimating Throughput Without Speed Data

All three motion speeds are published, so cycle times are calculable rather than assumed.

Operator Sightlines at 200 Tons

Cab control keeps the operator with the load on long runways where a floor remote loses the view.

Approval Delays on Site

CE and ISO certification supplied with the crane removes one of the common mobilisation hold points.

Specifications

Published Figures For This Product

Every value below comes from our own product specification. Where a figure is not published we leave it out rather than estimating it.

200 Ton Crane Solution specification
Product NameWinch Double Beam Overhead Crane
Lifting Load100 to 360 tons
Core ComponentsGearbox, motor, frequency converter
Crane FeatureBridge crane
Span Range0-49 m
Max Lifting Height30 m / 40 m
Lifting Speed0.4-20 m/min
Long Travelling Speed5-90 m/min
Cross Travelling Speed4-40 m/min
HoistEuropean-style electric wire rope hoist
Control OptionsWireless remote control, cab control, handheld control
Weight5000 kg
Place of OriginHenan, China
Warranty1 year
CertificationsCE, ISO
GradeCE and ISO certified
Packing and documents

How It Ships And What Comes With It

Packing And Loading

Shipping volume for this item depends on the configuration and capacity you select, so no fixed container figure is published. Confirm the specification and the destination and a loading plan is issued with the quotation, rather than a figure we cannot support.

Documentation On File

Sourcing And Inspection

This product is supplied through TrueGlow Imaging, working with manufacturing partners whose facilities are visited and verified rather than taken on trust. In-process quality control and delivery supervision are available so goods are inspected before the container is sealed. Certifications quoted on this page are those stated on the product specification and belong to that product range rather than to our trading entity, so ask for the certificate covering your specific item.

Handling guide

Getting It Right First Time

Step 1

Confirm runway and building steel capacity for a 200 ton crane before design starts.

Step 2

Send span, hook height and the required cycle rate so speeds can be checked against your throughput.

Step 3

Select the control format; at this capacity cab control is the usual choice.

Step 4

Request CE and ISO certificates for the project quality file at order stage.

Step 5

Schedule load testing, operator training and handover documentation at commissioning.

Comparison

How It Compares In Our Range

The 200 ton winch build against the lighter overhead range.

Alternatives to 200 Ton Crane Solution
Winch Double Beam 200 TonLifting load 100 to 360 tons, span 0-49 m, lift 30/40 m, lifting 0.4-20 m/min, long travel 5-90 m/min, cross travel 4-40 m/min, CE and ISO.
Light Double Beam Cranes5 to 100 tons at 0.4-16 m/min. Suitable for regular production lifting, not for 200 ton duty.
FAQ

200 Ton Crane Solution Questions

What is the lifting load range?

100 to 360 tons on this frame, so 200 tons is inside the normal working range.

How fast does it travel?

Lifting 0.4-20 m/min, long travelling 5-90 m/min and cross travelling 4-40 m/min.

What certification is supplied?

CE and ISO. Certificates are provided with the documentation package.

Where is the crane built?

Henan, China, with a one year warranty.

What hoist is fitted?

A European-style electric wire rope hoist.

Can the operator work from a cab?

Yes. Wireless remote control, cab control and handheld control are all available.

Industries

Sectors That Use This Product

Warehousing and Heavy Industry

Lifting from 250 kg to 360 tons, indoors on a runway or outdoors on legs.

Metal Fabrication and Machine Shops

Custom parts, tooling and the cranes that move them around the shop.

Power and Transformer Manufacturing

Winding conductor and core steel specified by conductivity and loss, not by weight.

Further reading

Guides That Cover This Product

Choosing an Overhead Crane Light Build or Winch Build

Most crane enquiries name a tonnage. The two questions that actually decide the crane are whether the hook pulls as well as lifts, and how many lifts it makes per shift.

Choosing a Jib Crane Mounting for Your Building

Six mounting types exist because the building constrains the crane more often than the load does. Wall, column, free-standing, articulating, mast and portable each solve a different constraint.

Quote 200 Ton Crane Solution

Send the capacity or size you need, the quantity and the destination, and we will confirm the configuration, the lead time and a loading plan.