A CIP set with its acid, alkali and water tanks, running the acid, alkali, hot water and cold water

Logistics Installation and Support

Container planning, commissioning and the spare parts route after the warranty ends.

Equipment is bought once and supported for twenty years. Container loading planning, installation and commissioning, load testing, operator training and a documented spare parts route are what separate a machine that runs for two decades from one that stops permanently the first time a component fails.

The problem

Why Buyers Come To Us For This

Buyers plan the purchase carefully and the aftermath not at all. Freight is booked late, the crane arrives before the runway is ready, nobody schedules the load test, and three years later a failed inverter cannot be replaced because nobody recorded what it was. All four are avoidable at no cost by deciding them at order stage.

The process

How It Works Step By Step

Plan the Container Before the Order

Container loading figures are published on several products. Landed cost per unit is then arithmetic rather than a surprise at booking.

Sequence Site Readiness

Runway steel, foundations, drainage, power and water have to be ready before the equipment lands, not after.

Commission and Load Test

Load testing on cranes and thermal validation on process equipment, both scheduled as part of handover rather than afterwards.

Train the Operators

On packaging lines, changeover skill decides available capacity. On cranes, it decides safety. Neither is a machine specification.

Record the Component List

Named control components mean spares come from ordinary industrial supply. Record the part numbers at commissioning while somebody still knows them.

In practice

What This Looks Like On The Ground

A CIP set with its acid, alkali and water tanks, running the acid, alkali, hot water and cold water sequence u
A CIP set with its acid, alkali and water tanks, running the acid, alkali, hot water and cold water sequence under SIEMENS PLC control.
Robot palletizer stacking packs at the end of a beverage line, running 20 to 80 cartons per minute under full-
Robot palletizer stacking packs at the end of a beverage line, running 20 to 80 cartons per minute under full-auto PLC control.
Plate pasteuriser skid with plate pack, product pump, hot water set and balance tank, supplied complete rather
Plate pasteuriser skid with plate pack, product pump, hot water set and balance tank, supplied complete rather than as a bare plate pack.
What we need from you

Send Us These And The Answer Comes Back Complete

  • Destination port and any inland transport constraints
  • Site readiness dates for foundations, power and utilities
  • Local regulatory requirements, including pressure vessel registration
  • Operator availability for training at commissioning
  • Your preferred spare parts holding policy
  • Documentation format required for your own audit
Product groups

Groups Most Often Involved

Overhead Cranes

10 to 200 tons on double beam bridges spanning up to 49 metres, in light and winch builds.

Dairy Processing Machinery

Tanks, separation, heat treatment and filling for every stage between the milking parlour and the pallet.

Packaging Machines

Labelling, sleeving, wrapping, cartoning, palletizing and depalletizing at line speed.

Plant Utility Equipment

Boilers, cooling towers, air compressors and chillers sized to the process they serve.

FAQ

Logistics Installation and Support Questions

How is equipment shipped?

Sea freight is supported across the range. Large cranes ship in sections for assembly on the runway.

Do you provide installation?

Installation and commissioning are quoted separately once the runway drawings or plant layout are reviewed.

What documentation comes with the equipment?

Drawings, electrical schematics, operating and maintenance instructions, test records and any certificates the product carries.

How do we get spare parts later?

Control components are named brands, so most spares come from ordinary industrial supply. Record the part numbers at commissioning.

Is operator training included?

Training on the supplied equipment is arranged with commissioning. Confirm operator availability when the schedule is set.

What about regulatory approvals?

Pressure vessels, lifting equipment and radiation equipment all carry local registration requirements. Confirm them before the equipment arrives.

Start With Logistics Installation and Support

Send the list above and we will come back with a complete answer rather than a request for more information.