
150 Ton Crane Solution
A CE and ISO certified winch crane for 150 ton duty, built with a double beam, a bridge design and a European-style electric wire rope hoist.

Product Overview
A CE and ISO certified winch crane for 150 ton duty, built with a double beam, a bridge design and a European-style electric wire rope hoist. It is customisable from 5 up to 360 tons for projects that need more lifting and horizontal movement, spans up to 49 metres and reaches a lifting height of 30 or 40 metres. It is specified for construction, heavy manufacturing, shipbuilding, aerospace, metal and mining, power generation and transport projects.
Why Buyers Choose This Specification
Certification at Heavy Capacity
CE and ISO certification on a 150 ton crane is what site insurers and main contractors ask for first. It is part of this build rather than an option.
European-Style Wire Rope Hoist
A European-style hoist is more compact than a conventional one, which recovers hook approach and therefore usable lifting height inside a fixed building.
Headroom to 360 Tons
The same design is customisable to 360 tons. A plant planning heavier lifts within the crane's life is not buying a ceiling.
Stable Under Horizontal Pull
The winch and bridge combination is specified for lifting plus horizontal movement, not lifting alone, which is the failure point of lighter builds at this capacity.
Where It Is Used
- Shipbuilding handling large hull sections
- Aerospace manufacturing lifting large assemblies and tooling
- Heavy manufacturing moving fabricated structures
- Metal and mining plants handling process equipment
- Power generation installing and servicing heavy plant
- Transport and logistics moving outsized freight
The Buyers This Product Suits
Projects With a Certification Requirement
CE and ISO certified equipment is often a precondition of the contract, particularly on power and infrastructure work.
Shipyards and Aerospace Plants
Both are named applications and both need controlled horizontal movement as well as lift.
Operations Planning Capacity Growth
Customisation to 360 tons on the same design means one supplier and one spares set across the range.
What It Fixes
Hook Approach Eating Usable Height
At 150 tons the hoist is large. The European-style electric wire rope hoist is chosen to keep the hook closer to the girder.
Uncertified Heavy Lifting Equipment
CE and ISO certification is carried by this build, which removes an approval step during site mobilisation.
Cranes That Lift but Cannot Pull
The winch build is designed for both lifting and horizontal movement at heavy capacity.
Published Figures For This Product
Every value below comes from our own product specification. Where a figure is not published we leave it out rather than estimating it.
| Rated Lifting Capacity | 150 tons |
|---|---|
| Winch Overhead Range | 5 to 360 tons |
| Crane Type | Winch double beam overhead crane |
| Core Components | Gearbox, motor, frequency converter |
| Span Range | 0-49 m |
| Max Lifting Height | 30 m / 40 m |
| Lifting Speed | 0.4-20 m/min |
| Long Travelling Speed | 5-90 m/min |
| Cross Travelling Speed | 4-40 m/min |
| Control Options | Wireless remote, cab control, handheld pendant |
| Place of Origin | Henan, China |
| Warranty | 1 year |
| Certifications | CE, ISO |
| Grade | CE and ISO certified |
How It Ships And What Comes With It
Packing And Loading
Shipping volume for this item depends on the configuration and capacity you select, so no fixed container figure is published. Confirm the specification and the destination and a loading plan is issued with the quotation, rather than a figure we cannot support.
Documentation On File
- Cranes and Material Handling · Overhead Cranes Specification Sheet32.4 KB
- Catalogue · Full Product Catalogue154.0 KB
Sourcing And Inspection
This product is supplied through TrueGlow Imaging, working with manufacturing partners whose facilities are visited and verified rather than taken on trust. In-process quality control and delivery supervision are available so goods are inspected before the container is sealed. Certifications quoted on this page are those stated on the product specification and belong to that product range rather than to our trading entity, so ask for the certificate covering your specific item.
Getting It Right First Time
Step 1
Establish the heaviest single lift and whether loads are also pulled horizontally.
Step 2
Send span, clear height and runway design loads together, since all three constrain the design at this capacity.
Step 3
Request the CE and ISO certificates during the quotation stage for the site file.
Step 4
Specify the control format; cab control is usual at 150 tons.
Step 5
Agree load test, training and handover documentation before shipment.
How It Compares In Our Range
How the 150 ton winch build sits against the lighter overhead cranes in the same range.
| Winch 150 Ton Crane | Double beam, bridge design, European-style electric wire rope hoist, CE and ISO certified, customisable 5 to 360 tons, span to 49 m. |
|---|---|
| Light Double Beam Cranes | Rated 5 to 100 tons. Cost-effective for regular lifting but not intended for continuous heavy duty or horizontal pulling at 150 tons. |
150 Ton Crane Solution Questions
Is the crane certified?
Yes, it is CE and ISO certified. Certificates are issued with the quotation on request.
Can it be built heavier than 150 tons?
Yes. The winch crane is customisable to handle 5 up to 360 tons.
What span is available?
Up to 49 metres, with a lifting height of 30 or 40 metres.
Why a European-style hoist?
It is more compact, which improves hook approach and recovers usable lifting height inside a fixed building.
Does it handle horizontal pulling?
Yes. The winch build is specified for heavy lifting together with horizontal movement.
What is the delivery arrangement?
The crane ships in sections for assembly on the runway. Shipping volume is confirmed once the span and hoist are fixed.
Sectors That Use This Product
Warehousing and Heavy Industry
Lifting from 250 kg to 360 tons, indoors on a runway or outdoors on legs.
Metal Fabrication and Machine Shops
Custom parts, tooling and the cranes that move them around the shop.
Power and Transformer Manufacturing
Winding conductor and core steel specified by conductivity and loss, not by weight.
Guides That Cover This Product
Choosing an Overhead Crane Light Build or Winch Build
Most crane enquiries name a tonnage. The two questions that actually decide the crane are whether the hook pulls as well as lifts, and how many lifts it makes per shift.
Choosing a Jib Crane Mounting for Your Building
Six mounting types exist because the building constrains the crane more often than the load does. Wall, column, free-standing, articulating, mast and portable each solve a different constraint.
Quote 150 Ton Crane Solution
Send the capacity or size you need, the quantity and the destination, and we will confirm the configuration, the lead time and a loading plan.


