Skip to content

Industry Application

Data Centres and Industrial Plant

MV distribution switchgear generator connections and busbar systems inside critical facilities

Data Centres and Industrial Plant

Industry Pain Points

What Goes Wrong in This Sector

A Switchboard Fault Takes Out a Whole Hall

Animal ingress condensation and dust bridging bare busbar is one of the most common causes of a catastrophic switchboard failure.

Halogenated Smoke in an Occupied Building Is Unacceptable

Corrosive gas from a cable fire destroys electronics far beyond the fire itself.

Compact Switchgear Cannot Achieve Clearance in Air Alone

Floor space is expensive so cubicles get smaller and insulation has to do the work.

Maintenance Access Must Not Be Blocked

Bolted joints need torque checks and thermographic survey which means insulation has to be removable.

Customer Requirements

What Buyers in This Sector Actually Need

  • Halogen free busbar insulation across the full voltage range
  • Molded lap joint covers that open for inspection without damage
  • UL recognised material for equipment built for export or North American use
  • MV termination kits for incoming supplies and generator connections
  • One supplier for the whole switchboard so a single bill of materials covers it

Typical Scenarios

Where These Products Are Installed

MV Switchgear Busbar Insulation

Halogen free insulated main bar and droppers inside 24 kV and 36 kV cubicles.

Bolted Busbar Lap Joints

Removable molded covers on connections that require thermographic survey.

Generator Connection Bars

Insulated bar between generator sets and MV switchgear.

Incoming Supply Terminations

MV terminations on utility incomers into the facility.

UPS and Battery Room Bar

Insulated copper bar in DC systems.

Cable Entry Sealing

Halogen free sealing where cable passes through gland plates and barriers.

Solution Process

How We Work with This Sector

  1. 01

    Take Off from the Busbar Drawing

    Send the bar sections lengths and joint details and we will quote every tube length and molded cover as one package.

  2. 02

    Confirm Halogen Free or Flame Retardant

    Occupied and critical buildings normally specify halogen free. Phase colour identification is available on the flame retardant grades.

  3. 03

    Cut Lengths and Labelling

    Tube supplied cut to your lengths and labelled per position so assembly does not have to measure.

  4. 04

    Custom Joint Cover Tooling

    Molded covers tooled to your joint geometry with a first article for approval.

  5. 05

    Production and Delivery to the Assembly Line

    Delivery timed to the switchboard build programme.

  6. 06

    Maintenance Spares

    A holding of covers and tube for future maintenance and modifications.

Delivery Capability

What We Commit to

  • Tube cut to length and labelled per position
  • Custom molded lap joint covers from your drawing
  • Halogen free and UL 224 recognised options
  • One bill of materials covering the whole switchboard
  • Repeat orders from existing tooling ship fast

FAQ

Data Centres and Industrial Plant Frequently Asked Questions

Does insulating busbar let us reduce phase spacing
It raises the flashover withstand between bars which is why compact switchgear designs use it. The permitted spacing is set by your design standard and type test so confirm with your design authority.
How do we insulate the bolted joints
S1-B molded covers are made to your joint dimensions and open with a buckle so the joint can be inspected and torque checked without damage.
Which products are UL recognised
The S1 family is recognised under UL 224 file E341796 covering S1-1 S1-10 and S1-35 ratings.
Can you supply tube cut to our lengths
Yes. Send the bar schedule and we will supply cut and labelled pieces which removes measuring and waste from the assembly line.
Is halogen free available at 36 kV
Yes. S1(n)-35 covers 6 to 36 kV in a halogen free RoHS compliant formulation.
What is the lead time for custom joint covers
Tooling and first article typically run 20 to 30 working days. Repeat orders from existing tooling ship much faster.

Still need an answer ask our engineers on WhatsApp

Talk to Us About Data Centres and Industrial Plant

Send your cable schedule drawing or specification and we will return part numbers quantities and a lead time.