
DE Series Water Centrifugal Pump
Process-duty water pump from DN 25 to DN 400 with flow to 600 m³/h for water and waste water
View specificationsPlant water, process circulation, booster and liquid transfer duties across the full Flowsteer size band.

Pallet racking holding pump casings, bearing frames and baseplates in the parts store

Process-duty water pump from DN 25 to DN 400 with flow to 600 m³/h for water and waste water
View specifications
ISO 2858 and ISO 5199 back-pull-out end-suction pump, fully interchangeable with other ISO brands
View specifications
Horizontal single-stage pump in PP, PE and UHMW-PE for water that attacks metal wetted parts
View specifications
BS EN733 / DIN24255 end-suction pump, 2 to 1100 m³/h and head to 152 m, for building services fire and irrigation
View specifications
Vertical single-stage sump pump in polypropylene for wet-pit installation with solids to 20 percent
View specifications
Four of the five Flowsteer series use back pull-out construction. Here is what that changes about a maintenance window.
Read more
Cast iron through to UHMW-PE. How the Flowsteer range maps onto water that ranges from clean to chemically hostile.
Read more
ANSI/ASME B73.1, ISO 2858, ISO 5199 and BS EN733. What each standard actually fixes, and what that means when a pump is replaced.
Read more
The single construction feature that decides whether a seal change takes two hours or two days.
Read more
Grey iron through to UHMW-PE. What each wetted material is for, and the failure it is chosen to prevent.
Read more
Cavitation is not a pump defect. It is a suction system defect that destroys the pump, and it is almost always designed in rather than developed.
Read moreThe DE series is published across that band and the other four series overlap it, so most industrial water duties on a site can be met from one catalogue.
By the water analysis and the temperature. If the chemistry attacks iron and stainless, the KCP series in PP, PE or UHMW-PE is the answer; if it does not, the metal series give higher flow, head and temperature.
The pipework stays bolted to the casing, so flange breaking, re-gasketing and pipe re-alignment all disappear from the job. What remains is uncoupling the driver and withdrawing the rotating assembly.
Because the source catalogue does not publish them. We would rather mark a value unconfirmed than print a number we cannot stand behind, and we confirm it in writing at enquiry.
Send the duty point, the supply frequency and what the liquid is. We will name the series, the size and the published specification.