Project Case · Mining and Heavy Industry
Trailing Cable Repair Programme at an Open Pit Mine
Site stock sized against actual consumption instead of a forecast
Client Background
An open pit mine was consuming trailing cable at a rate that made it one of the site's largest maintenance consumables. Most of the consumption was driven by localised abrasion damage rather than by end of life.
Project Challenge
Give the mine's electrical maintenance team the capability to repair abraded trailing cable in the field, and set a stock holding that means they never wait for material.
Customer Pain Points
- Trailing cable replaced whole because of localised abrasion
- Repairs attempted with general purpose tubing failing within weeks
- No agreed stock holding so material was ordered reactively
- Maintenance electricians rather than specialist jointers doing the work
Our Solution
R1 wraparound sleeves for the terminated positions and S3(nh) heavy wall tubing for free end repairs. Illustrated instructions were rewritten for a maintenance electrician rather than a specialist jointer. Stock holding was set provisionally then adjusted after one maintenance cycle against what was actually consumed.
Manufacturing Process
Heavy wall grades with the thickened design that gives the abrasion allowance an open pit needs. Adhesive lined throughout because every position is exposed to water.
Supply Chain Coordination
Provisional holding delivered then reviewed after three months. The final holding was roughly forty percent smaller than the initial estimate in two sizes and larger in one.
Quality Control
Per lot testing of tensile strength elongation heat aging and water absorption with batch traceability on every carton.
Final Result
Repair became a routine shift activity rather than an event. Trailing cable consumption fell materially in the first year and the maintenance team stopped ordering reactively.
Customer Benefit
A repair capability that lives with the maintenance team, and a stock holding sized by what actually gets used.
Products
Products Supplied on This Project
R1 Repair Sleeve
A rail and channel closure sleeve that repairs a damaged cable jacket without cutting the cable or removing the terminations
VIEW DETAILSS3(nh) Heavy Wall HF
Thickened halogen free polyolefin tubing where the same fire performance is needed with far more mechanical protection
VIEW DETAILSS3(h) Heavy Wall FR
The toughest tube in the S3 family combining flame retardant marine formulation with a thickened heavy wall
VIEW DETAILST1 Heat Shrink Tape
Adhesive lined heat shrink tape that seals and insulates irregular shapes where no tube or sleeve will fit
VIEW DETAILSFAQ
Questions About This Project
How many times can a trailing cable be repaired
Why did general purpose tubing fail
How do you size a stock holding
Can maintenance electricians do this work
Still need an answer ask our engineers on WhatsApp
More Cases
Other Projects
15 kV Feeder Refurbishment for a Distribution Utility in Southeast Asia
820 terminations and 140 joints delivered against a 14 week outage programme
READ CASE →Retrofitting Creepage on Flashover Prone Outdoor Terminations
Rain sheds fitted to 96 existing 33 kV terminations without rebuilding any of them
READ CASE →Accessory Package for a 350 MW Solar Collector Circuit
Take off from a single line diagram consolidated 14 part numbers down to 5