Custom Automation Since 2018
Vacuum cup head of the Delkotech pick and place gantry lowered onto a steel blank
  1. Home
  2. Products
  3. Robotics and Motion Systems

DK-03

Robotics and Motion Systems

Robot and servo motion integrated into a working production cell

Equipment in This Group

All 2 Machines in This Group

A robot arm on its own is not a solution. It needs tooling, presentation, guarding, a controller that talks to the rest of the line, and a cycle that holds up over a full shift. That integration work is what this group covers.

The Problem This Group Addresses

What Goes Wrong Without It

Plants often buy a robot and then discover the real cost is everywhere else: end of arm tooling, part presentation, safety interlocking and line control. Delkotech scopes the whole cell so the robot arrives into a system that is already designed around it.

  • Machines built to the part, not to a catalogue envelope
  • Sequence of operation written before any code
  • Safety and guarding laid out with the machine
  • Rate proved with your parts before shipment
  • As built drawings and test records at handover

Questions

About Robotics and Motion Systems

What is in the Robotics and Motion group?

2 machine families: Robotic Motion Assembly, Micro Assembly Technology. Each is built to order around your part.

Which of these should I be looking at?

Plants often buy a robot and then discover the real cost is everywhere else: end of arm tooling, part presentation, safety interlocking and line control. If you describe the step that is causing trouble we will point you at the right machine rather than the largest one.

Can these machines be integrated with equipment we already own?

Yes. Give us the make, model and available signals of the equipment either side and the handshake is designed in from the start.

Why are the specifications marked TBC?

Because these are machines built to order. Travels, forces and cycle times are set against your part at design review and then measured and recorded before shipment. Publishing a number before that point would be guesswork.

How long does a machine in this group take to build?

Lead time depends on the configuration and the current build schedule at the Vaughan facility. Email [email protected] with your requirement and target date and we will give you a schedule.

Delkotech automation cell under build at the Vaughan facility

Talk to an engineer

Bring Us the Operation, Not the Machine

Send the part drawing and describe the step. We will come back with a concept, a layout and a defined scope.