Prefab construction contractor in Weifang, Shandong. We engineer…
Quality Prefab House
Workforce camp under construction with stacked wall panels and a crane in Guinea
Completed two-storey prefab building with steel frame and insulated panels in Thailand
Clear-span steel portal frame interior of a pre-engineered industrial building
Accommodation camp of prefab buildings serving a hydropower project in El Salvador
Prefab construction contractor · Projects in 60+ countries

We Engineer and Deliver Complete Prefab Projects

Worker camps, prefab buildings and steel structures — designed, fabricated, shipped and installed by one team, from the first drawing to handover on site.

  • In-house engineering and fabrication
  • Engineered to wind and seismic loads
  • Container loading plans and export documents
  • On-site installation supervision
The full range

Thirteen Products Across Three Systems

Every product below is engineered and fabricated on our own site. Nothing here is resold.

Accommodation & Camps

Prefab Buildings

Steel Structures

What problem we solve

Where Prefab Projects Usually Go Wrong

Most of the cost and delay on an imported prefab project is not in the units. It is in the gaps between the people who drew them, built them, packed them and put them up.

Drawings that do not match the steel

When engineering is bought from one company and fabrication from another, the bolt holes and the drawings stop agreeing somewhere over the ocean. Our engineers sit in the same building as the cutting line, so the erection drawings describe the steel that is actually in the container.

Freight paid on air

A badly packed camp ships empty space. Detachable and flat-pack units are knocked down so several homes fit one 40HQ container, and every project gets a container-by-container loading plan before anything is sealed.

A kit nobody on site can read

A local crew cannot guess an assembly sequence. Members and panels are marked to the erection drawings, and a bolt and panel schedule ships with the job so the sequence is obvious from the first module.

Quality you only see at the port

Three-stage quality control with photo reports before every container seals means problems are found in Weifang, where fixing them costs a shift — not on site, where fixing them costs a season.

Why buyers stay

Everything Under One Roof

No trading-company markup, no lost detail between vendors. Engineering, fabrication, quality control and export logistics sit in one building.

Featured project · Guinea

Simandou Bauxite Mine Camp

Simandou workforce camp under construction with stacked panels and a crane in Guinea

A workforce camp for one of the world's largest bauxite and iron-ore developments — dormitories, canteens, offices and ablution blocks in over 500 container modules, stacked two storeys high with crane support.

500+Modules
2Storeys
2024Delivered
Mining campUse
How an order ships

Drawing to Doorstep in Four Moves

The same four steps whether the order is one expandable house or a 500-module camp.

Design and quote

Share dimensions or a sketch. We return drawings, a spec sheet and a fixed price before you commit to anything.

Fabricate

Frames cut, welded and galvanised; panels and fittings assembled and checked against the approved drawings.

Flat-pack and ship

Units knocked down and loaded to your loading plan, photographed before the container is sealed.

Assemble on site

Bolt-together build from marked members and our drawings, with remote engineering support and supervision available.

Buyer questions

Before You Order

Straight answers on freight, lead time and standards. Need something specific to your market?

What is the minimum order?

There is no fixed minimum order quantity on standard units. We ship single samples so a distributor can test a market, and quote project volumes by container load to keep freight per unit low.

How do prefab homes ship overseas?

Expandable and flat-pack units are knocked down so several homes fit one 40HQ container. Fixed steel modules ship as out-of-gauge or break-bulk cargo with a tailored loading plan.

What is the lead time?

Standard expandable container homes ship in 20 to 30 days. Custom steel structures and villa projects run 35 to 60 days depending on engineering and volume.

Which standards do you meet?

Structures are engineered to AS/NZS, EN (CE) and your specified wind and seismic loads, with material certificates and load-test reports supplied per order.

Do you support installation?

Every order ships with assembly drawings, a bolt and panel schedule and remote engineering support. Supervised on-site installation is available for projects.

Can you work to our own drawings?

Yes. Send the architectural or structural drawings you already have and our engineers will return a prefab version with the connections, load calculations and packing detailed for your destination.

Tell Us About Your Project

Send a brief or a sketch — we come back with drawings, a scope and a price.