Prefab construction contractor in Weifang, Shandong. We engineer…
Quality Prefab House
Long container accommodation block beside a red-earth haul road in Guinea
Product system

Accommodation and Camps Built From Container Modules

Standard and detachable container units for offices, canteens, ablutions and dormitories — stackable up to three storeys with external steel staircases for fast-build labour camps and remote site accommodation.

What problem we solve

Why Buyers Come to Us for This

Remote projects need habitable accommodation before the main works can start, and every week the crew sleeps off site is a week of paid travel and lost production. A camp has to arrive as one coordinated shipment, survive a long inland haul, and go up with the labour and lifting gear already on the project.

  • Standard 20 ft and 40 ft footprints that combine into larger rooms
  • Detachable type flat-packs to cut freight cost per unit
  • Stackable to three storeys with external steel stairs
  • Fire-rated rock-wool panel option
Rows of container accommodation units on a completed worker camp
Who it is for

Buyers This System Suits

Mining and resources

Workforce villages on greenfield sites with no local housing stock.

Energy and infrastructure

Contractor camps that follow a dam, a line or a road corridor.

Humanitarian and government

Serviced housing delivered to a schedule set by the season.

Civil contractors

Site offices, meeting rooms and ablutions for the duration of a build.

How an order runs

From Brief to Handover

Design and quote

Share dimensions or a sketch. We return drawings, a spec sheet and a fixed price before you commit to anything.

Fabricate

Frames cut, welded and galvanised; panels and fittings assembled and checked against the approved drawings.

Flat-pack and ship

Units knocked down and loaded to your loading plan, photographed before the container is sealed.

Assemble on site

Bolt-together build from marked members and our drawings, with remote engineering support and supervision available.

Buyer questions

Accommodation & Camps Questions

The questions buyers ask before committing to this system.

How many detachable houses fit in one 40HQ container?

Because the unit knocks down to a flat stack, several houses fit one 40HQ container. The exact figure depends on the specification, so it is confirmed on your loading plan before the order is placed.

What is the lead time for expandable container homes?

Standard expandable container homes ship in 20 to 30 days. Custom steel structures and villa projects run 35 to 60 days depending on engineering and volume.

Can units be combined into a larger office?

Yes. The 20 ft and 40 ft footprints combine on a common grid, and internal walls between combined units can be omitted to give an open-plan office or meeting room.

How many people does one module sleep?

It depends on the occupancy you specify. Modules are combined and fitted out to your room layout, so bed count per room is confirmed on the approved camp drawing.

Is the kitchen fitted before it ships?

Yes. Cabinets, worktops, appliances and services are installed and function tested in Weifang, so site work is connection and commissioning.

Planning a Camps Project

Send dimensions, a headcount or a sketch and we will come back with drawings and a fixed price.