Prefab Camps for Mining and Resources Projects

Mines are developed where the ore is, not where the housing is. We build the village that makes the site workable — and we have done it at 500+ module scale on bauxite developments in Guinea.

Industry pain points

What Makes This Difficult

No housing within reach of the lease

Greenfield mining sites have no rental stock. If the camp is not imported, the workforce commutes — and the commute becomes a permanent cost and a permanent safety exposure.

Long inland hauls on unsealed roads

Ore bodies sit at the end of haul roads. Finished volumetric modules with glazing and fittings do not enjoy that journey; flat panel stacks do.

Headcount that moves with the phase

Construction peak, commissioning and steady-state operation need different bed counts. A camp that cannot be extended or reduced is a camp that is wrong most of the time.

Pads that cost money to extend

Earthworks on a remote site are expensive. Stacking two storeys is usually cheaper than clearing more ground.

Customer requirements

What Buyers in This Sector Need

A whole village, not a product

Dormitories, canteen, offices, ablutions and recreation — on one grid, from one supplier, with one erection sequence.

Freight planned to the container

At several hundred modules, cost per bed is decided by how well the containers are packed.

Engineering for the site's loads

Wind, seismic and stacking loads calculated for the actual location, with stamped reports.

Documentation a local crew can build from

Marked members, erection drawings and a bolt schedule, plus engineers who stay reachable.

Typical scenarios

Where These Buildings Go

Construction-phase camps

Accommodation for the peak workforce building the mine, sized to be reduced when the project moves to operations.

Operations villages

Permanent accommodation for the operating crew, built to a standard people can live with for years.

Exploration and early works

Small camps that grow into the main village as the project is confirmed.

Contractor compounds

Separate offices and accommodation for contractors working on the lease.

Solution process

How a Project Runs

Brief

Headcount, phasing, pad size, port and the loading data for the site.

Camp layout

Buildings, circulation and services drawn on one grid and approved.

Engineering

Structural drawings and load calculations, including the stacking case.

Fabrication

Frames cut, welded and galvanised; interiors and services fitted and tested.

Sequenced shipping

Containers numbered and planned so the site erects continuously.

Erection

Modules opened, combined, stacked and connected, with supervision available.

Delivery capability

What We Have Actually Delivered

500+ modules in one camp

The Simandou workforce camp for WCS — dormitories, canteens, offices and ablution blocks stacked two storeys high.

180-module camp

A COBAD – RUSAL bauxite mine camp with finished interiors and corridors ready on arrival.

Photo reports before sealing

Three-stage quality control with photographs issued before every container is closed.

Loading plans that maximise units per box

Container-by-container packing that keeps freight per bed down at scale.

Buyer questions

Mining and Resources FAQ

The questions this sector asks before committing.

How large a mining camp can you deliver?

The largest camp we have delivered is over 500 modules for the Simandou bauxite and iron-ore development in Guinea — dormitories, canteens, offices and ablution blocks stacked two storeys high.

Can the camp be extended later?

Yes. Modules bolt together, so rows can be extended, re-arranged or relocated as the project phase changes.

How are modules protected on a long haul road?

Detachable modules ship as flat panel stacks rather than finished boxes, which survive unsealed inland haulage far better.

Do you supply engineering for the stacking?

Yes. Two and three-storey stacking is engineered to the wind and seismic loads you specify, with load-test reports supplied per order.

Can you supervise the installation?

Every order ships with assembly drawings and a bolt and panel schedule, and supervised on-site installation is available for projects.