Camps and Buildings for Energy and Hydropower Projects
Energy projects are built in valleys, deserts and coastlines — places chosen by the resource, not by the availability of housing. We build the accommodation that makes a multi-year construction programme liveable.
What Makes This Difficult
Sites chosen by geography
A dam goes where the river is. Housing has to be brought to it.
Multi-year occupation
People live in an energy construction camp for years. A standard that is acceptable for a month is not acceptable for a programme.
Limited level ground
Valley and coastal sites rarely offer a large flat pad, so the camp has to build upwards.
Services that must come with the buildings
Lighting and sanitary facilities cannot be a later addition on a site that has no local trades.
What Buyers in This Sector Need
Two-storey stacking
External steel staircases to fit the required bed count onto limited level ground.
Finished interiors and services
Units that arrive with lighting and sanitary facilities installed and tested.
A camp that works as a settlement
Dormitories, canteen and offices arranged around circulation rather than in an anonymous line.
Long sea-leg packing
Loading plans that protect finished interiors across a long voyage.
Products That Fit This Sector

Worker Dormitory Block
The sleeping accommodation that most of a camp is made of. Rooms are combined from standard units, stacked two storeys with external…
View product
Container Canteen and Kitchen
The building a camp is judged by. Kitchens are fitted out and tested in Weifang, then combined on site into a servery and dining hal…
View product
Standard Container Site Office
The site office version of our standard container unit — 20 ft and 40 ft footprints that combine sideways into whatever office the p…
View product
Ablution and Sanitary Block
The module with the least tolerance for improvisation. Floors, falls, waterproofing and fittings are built and tested in the factory…
View productWhere These Buildings Go
Hydropower construction camps
Accommodation for the duration of a dam or station build.
Transmission and line corridors
Camps that move along a corridor as the works progress.
Power plant construction
Contractor accommodation and site offices beside the works.
Renewables sites
Accommodation and control buildings on remote wind and solar sites.
How a Project Runs
Brief
Headcount, programme duration, available level ground and destination port.
Layout
Camp planned around the usable ground, with circulation and services.
Engineering
Stacking, wind and seismic loads calculated for the site.
Fabrication and fit-out
Interiors, lighting and sanitary facilities installed and tested.
Shipping
Loading plans built for a long sea leg with finished interiors in transit.
Erection
Units stacked with external staircases and connected to site services.
What We Have Actually Delivered
120+ modules stacked two storeys
The TYAZHMASH hydropower station camp in El Salvador, arranged around landscaped paths.
Finished interiors as standard
Lighting and sanitary facilities installed and tested before the units shipped.
External steel staircases
Circulation outside the envelope, keeping internal area usable.
Long-haul packing experience
Camps shipped to Central America, West Africa, Europe and South East Asia.
Energy and Hydropower FAQ
The questions this sector asks before committing.
What size energy project camps have you delivered?
Over 120 modules for a hydropower station camp in El Salvador for TYAZHMASH — dormitories, canteen and offices stacked two storeys high with external steel staircases.
Can the camp fit on a narrow valley site?
Stacking two storeys is the usual answer to limited level ground, and it was exactly the approach taken on the El Salvador hydropower camp.
Are lighting and sanitary facilities included?
Yes. Units are fitted out with finished interiors, lighting and sanitary facilities before they ship.
How long can the camp stay in service?
These are engineered steel buildings, not temporary shelters. Camps on multi-year energy programmes are a normal application.
Can the camp be relocated to the next project?
Yes. Modules bolt together, so a camp can be dismantled and moved rather than written off.
Planning a Project in Energy and Hydropower
Tell us the country, the use and the rough size — we will scope it and quote.