Refugee Accommodation Camp Germany
A refugee accommodation camp in a German river valley, supplied to EN (CE) expectations — container modules with finished kitchens and bathrooms, habitable in a fraction of conventional build time.
Who the Project Was For
EBV-group required accommodation for a refugee camp in a German river valley, in a market where building standards and inspection are not negotiable and the timescale was set by need rather than by a construction programme.
Client — EBV-group
What Had to Be Solved
Deliver habitable, fully serviced housing to EN (CE) expectations, in a fraction of conventional build time, on a paved site in a European regulatory environment.
The Pressures on This Project
A European standards environment
Units had to meet EN (CE) expectations, not a generic export specification.
Housing needed immediately
Conventional construction could not answer the timescale.
Finished living spaces, not shelter
Kitchens and bathrooms had to be part of the units.
A constrained paved site
Units had to be craned into position accurately in neat rows.
What We Supplied and Why
96 container modules were supplied to EN (CE) expectations, with the specification agreed against European requirements before fabrication began.
Kitchens and bathrooms were installed and tested at the factory, so each unit arrived as a complete living space rather than a shell.
Units were craned into neat rows on the paved site and connected to services, giving habitable, fully serviced housing in a fraction of conventional build time.



How It Was Built and Shipped
Specification to EN (CE)
The unit specification was set against European expectations before fabrication.
Fabrication and fit-out
Frames fabricated and galvanised; kitchens, bathrooms and services installed and tested.
Packing and shipping
Units loaded to a container plan with photo reports before sealing.
Craning and connection
Units craned into rows on the paved site and connected to services.
Getting It There in the Right Order
A European delivery means documentation matters as much as the units. Material certificates and specification records shipped with the order.
What Was Checked
- Specification checked against EN (CE) expectations before fabrication
- Frame geometry and welds inspected before galvanising
- Kitchen and bathroom services function tested before dispatch
- Photo report issued before each container was sealed
What Was Delivered
96 modules with finished kitchens and bathrooms, craned into neat rows on a paved site and connected up — habitable, fully serviced housing delivered in a fraction of conventional build time.
What It Changed
- Housing was available on a timescale conventional construction could not match.
- Units met EN (CE) expectations, which is what made them usable in the German market.
- Finished kitchens and bathrooms meant residents moved into complete homes, not shells.
Products For This Requirement

Detachable Container House
The unit we build most camps from. It knocks down to a flat stack for the sea leg, then opens back out into a finished room that can…
View product
Container Canteen and Kitchen
The building a camp is judged by. Kitchens are fitted out and tested in Weifang, then combined on site into a servery and dining hal…
View product
Ablution and Sanitary Block
The module with the least tolerance for improvisation. Floors, falls, waterproofing and fittings are built and tested in the factory…
View productHave a Project Like This
Tell us the country, the use and the rough size — we will scope it and quote.