Chengyang District, Qingdao, China Mon-Sat 08:30-18:00 GMT+8
Floating offshore wind turbine on a yellow platform at sea with a blue service vessel and small tugboat nearby
Industry Application

Rigging and Cargo Control for Oil and Gas

Offshore lifting operations, securing heavy drilling components, and pipeline support systems demand rigging hardware that performs under extreme conditions. Kailipu supplies the full range of oil and gas rigging components from Qingdao on a single purchase order, including shackles, Grade 80 hooks, links, lifting chains, wire rope, pulley blocks, turnbuckles, and webbing slings, all built to withstand marine exposure and high-duty service.

Industry Pain Points

What Goes Wrong in Oil and Gas

  • A shackle rated at 100 tons but let down by a Grade 43 pin that fails under repeated load cycles
  • Chain links with inconsistent heat treatment causing premature fatigue in offshore lifting
  • Wire rope that frays at the eye splice due to improper fitting or mismatched thimble size
  • Pulley blocks with seized bearings after exposure to saltwater and high humidity
  • Hooks with latch mechanisms that fail to engage properly under dynamic load
  • No traceable material certificate when a class society audit requires proof of compliance
  • Multiple suppliers for different parts leading to mismatched ratings and delayed project timelines
What Buyers Need

What Oil and Gas Buyers Actually Specify

  • Shackles, hooks, and links with a 4:1 design factor and proof load tested with the record kept for the batch
  • Grade 80 alloy steel components heat treated and quenched for consistent hardness and fatigue resistance
  • Hardware with surface finishes such as hot dip galvanizing, powder coating, or electrophoretic black to resist marine corrosion
  • Components marked with WLL and traceability codes for audit readiness and chain of custody
  • Class certificates such as ABS, LR, BV, DNV, GL, RINA, KR, NK, RS, and CCS available on request
  • Matched assemblies where all components carry the same working load limit and are tested as a system
  • One consolidated order across multiple rigging families to avoid sourcing delays and mismatched specs
Typical Applications

Typical Applications in Oil and Gas

  • Offshore platform lifting of drilling risers using drop forged roller shackles with hexagon bolt pins and powder coated finish
  • Securing heavy pipeline sections on deck with Grade 80 eye grab hooks and swivel sets rated for dynamic loads
  • Running wire rope through pulley blocks on a crane system with sheave bearings designed for continuous marine service
  • Connecting lifting chains to shackles and hooks on a subsea intervention rig using welded joining shackles with galvanized finish
  • Using turnbuckles to tension mooring lines on a floating production unit with Grade 80 threaded links
  • Lifting heavy casing heads with webbing slings and pulley blocks where the system must handle both static and dynamic loads
  • Recovery operations on a jack-up rig using wide body shackles with hot dip galvanized pins and high-strength alloy steel
Solution Flow

How an Order Runs for This Sector

1{'name': 'Send US the Lifting or Securing Task And', 'note': 'Send us the lifting or securing task and the required working load limit so we recommend the correct component and grade'}
2{'name': 'We Confirm the Material (alloy Steel) H', 'note': 'We confirm the material (alloy steel), heat treatment (quenched and tempered), and finish (powder coated, galvanized, or'}
3{'name': 'We Match the Shackle Hook Chain and W', 'note': 'We match the shackle, hook, chain, and wire rope to the same WLL and confirm every rated part has been proof load tested'}
4{'name': 'We Provide Material Test Certificates To', 'note': 'We provide material test certificates to EN 10204 3.1 and class society certificates on request for audit compliance'}
5{'name': 'We Stamp the WLL and Traceability Code O', 'note': 'We stamp the WLL and traceability code on each component and verify dimensional tolerances before production'}
6{'name': 'Assemblies Are Proof Tested and Marked B', 'note': 'Assemblies are proof tested and marked before packing, with full quality control completed before shipment'}
7{'name': 'Pre-Shipment Inspection Conducted with P', 'note': 'Pre-shipment inspection conducted with production 100 percent complete and packing 80 percent complete'}
8{'name': 'Goods Shipped Consolidated from Our Qing', 'note': 'Goods shipped consolidated from our Qingdao warehouse with export documentation handled in house by sea, air, or express'}
Delivery Capability

Delivery Capability for This Sector

  • Direct supply from the original manufacturer with no middleman layer
  • Production lead time evaluated from several angles before a date is confirmed
  • Free quality inspection of goods in our Qingdao warehouse before they leave China
  • Two months of free warehouse storage in China to consolidate shipments with other rigging lines
  • Export and import documentation handled in house by sea, air, or express
  • Custom surface finishes including powder coating, zinc plating, and electrophoretic black available
  • Class certificates such as ABS, LR, BV, DNV, GL, RINA, KR, NK, RS, and CCS supplied on request
  • Custom tonnage stamping and private label marking available for branded rigging kits

Sourcing Support For This Industry

Answers

Oil and Gas Rigging FAQ

Are your Grade 80 hooks proof tested?
Yes, all Grade 80 hooks are proof load tested. The test is performed on production batches and documented for traceability.
What surface finishes are available for offshore use?
Available finishes include hot dip galvanizing, powder coating, electrophoretic black, and custom paint. These are selected for corrosion resistance in marine and offshore environments.
Do you supply class certificates for oil and gas applications?
Yes, class certificates such as ABS, LR, BV, DNV, GL, RINA, KR, NK, RS, and CCS are available on request. We provide documentation for each batch upon request.
Can you match a shackle, hook, and chain to the same working load limit?
Yes. We ensure all components in a lifting system carry the same WLL. The weakest component is not the limiting factor when all parts are rated to the same standard.
What is the design factor for your rigging hardware?
Standard design factor is 4:1 for rigging hardware unless otherwise stated. This applies to shackles, hooks, links, and pulley blocks unless a product specifies a different factor.
Can you supply custom tonnage stamping?
Yes. Custom tonnage stamping is available on request. We mark the WLL and traceability code on each component to meet audit and safety requirements.
How long is the lead time for new production?
New production lead time is approximately 25 days for manufacturing plus 7 days for packing, totaling about 35 days before shipment. This includes full quality control and pre-shipment inspection.

Get a Oil and Gas Rigging Package Quoted

Describe the duty, the load and the environment. We come back within 24 hours with the grade, the finish and the assembly that suits it.

We reply within 24 hours on WhatsApp or by email. Send a drawing, a photo or a bill of materials and we will quote it as it stands.