Chengyang District, Qingdao, China Mon-Sat 08:30-18:00 GMT+8
Workers in orange coveralls and hard hats guide a large yellow industrial lifting beam suspended by chains outdoors
Close-up of two large galvanized steel shackles with yellow pins resting on a wooden crate
Large industrial furnace glowing with bright orange flames and heat inside a factory
Rigging & Cargo Control · Qingdao China

One Purchase Order For The Whole Rigging Bill Of Materials

517 catalogued lines across rigging hardware, chain, webbing slings, ratchet straps, wire rope, pulley blocks and trailer winches. Matched assemblies, one shipment, one set of export documents, out of Qingdao.

517Catalogued Lines
8Product Families
15-20 DaysFrom Stock
24 HoursQuote Reply

What We Make

Rigging and cargo-control hardware: forged shackles, hooks, links, eye bolts and turnbuckles, welded and lifting chain, polyester flat and round slings, ratchet straps and tie-down hardware, steel wire rope and rope fittings, pulley and snatch blocks, trailer tie-down winches and marine anchor chain. 517 catalogued lines in eight families.

Who We Serve

Rigging and lifting distributors, load-securing and recovery gear brands, crane hire and lifting service companies, marine and offshore outfitters, precast and steel fabricators, and fleet operators in oil and gas, mining, drilling, marine and port, construction, transport and logistics, steel and heavy industry.

What Problem We Solve

A rigging bill of materials rarely comes out of one factory. Qingdao is full of forges that each do one thing well, so a buyer ends up running eight suppliers, eight lead times and eight sets of paperwork for one order. We hold the whole range, match the assemblies so nothing is rated by its weakest bought-in part, and ship it as one consignment.

Why Buyers Choose Us

A manufacturer's supply base with a trading company's order handling. Over 20 years of production experience behind the range, technicians with 20 years on rigging product lines, quality control staff with more than a decade in hardware tool companies, free inspection in our own Qingdao warehouse before goods leave China, and two months of free storage while an order is consolidated.

What We Make

Eight Product Families That Cover A Rigging Store

Each family is a full range rather than a sample of one. Open a family to see every catalogued line in it, the sizes we hold and the finishes available on the same pattern.

Catalogue

Lines Buyers Ask For First

A cross-section of the catalogue: forged shackles and hooks, grade 80 lifting components, ratchet assemblies, wire rope fittings and snatch blocks. Every image on this page is a real product photograph from our own range.

What Problem We Solve

Three Problems We Exist To Remove

None of them are about how many machines a factory owns. They are about what goes wrong between a drawing and a delivered pallet.

Eight Suppliers For One Order

Qingdao forges specialise, so a rigging store's bill of materials normally splits across many factories with different lead times, minimums and packing. We hold all eight families, take small top-up lines alongside the main order, and consolidate the lot into one shipment on one set of documents.

Assemblies Rated By Their Weakest Part

A lashing or lifting assembly is only as strong as its lowest-rated component, and mismatches get built when the webbing, the hook and the binder come from three sources. We match the components, proof test the assembly and mark it for what it is actually rated to carry.

Paperwork That Fails The Audit

A shackle without a legible grade stamp or a batch certificate cannot be signed into a lifting register. We stamp working load limits, keep proof load, dimensional and breaking strength records per batch, and issue a Material Test Certificate to EN 10204 3.1 on request.

Why Buy From Kailipu

What Actually Sits Behind The Catalogue

Kailipu was founded to merge the production strength of manufacturing with the order handling of a professional trading company, because Qingdao buyers need both and most suppliers offer one.

517Catalogued Product Lines
20+ YearsProduction Experience Behind The Range
15-20 DaysLead Time From Semi-Finished Stock
24 HoursEnquiry Reply From A Real Engineer
  • Over 20 years of production experience behind the supply base rather than a recently assembled catalogue
  • Technicians with more than 20 years of hands-on experience on rigging product manufacturing lines
  • Quality control staff who spent more than a decade inside recognised hardware tool companies
  • Direct supply from the original manufacturer instead of an extra trading layer taking margin
  • Production lead time evaluated from several angles before a delivery date is confirmed
  • Free quality inspection of goods in our Qingdao warehouse before they leave China
  • Two months of free warehouse storage so a mixed order can be consolidated into one container
  • Export and import documentation handled in house by sea, rail, air or express
  • Custom tonnage stamping, private label marking and retail packing for gear brands
  • A quotation reply within 24 hours of the enquiry, from someone who reads the drawing
Warehouse interior with blue and orange pallet racks filled with cardboard boxes and goods on a green floor
Our Qingdao WarehouseRacked stock is what makes a 15 to 20 day lead time possible on common lines, and what lets an order sit free for two months while the rest of it is built.
Glowing hot forged metal link on a roller conveyor inside a forge workshop
Heat Treatment On The LineForged rigging components leave the furnace on a roller conveyor for quench and temper. Heat treatment is where a forging becomes a rated component.
How An Order Runs

How An Order Runs From Enquiry To Delivered Pallet

This is the order flow the company has published for years, not a marketing diagram. Each step has a name and someone answering for it.

1EnquirySend the line list, a drawing or a photo by WhatsApp or email
2Project StudyWe check patterns sizes finishes and which lines are in stock
3QuotationPriced line by line and returned within 24 hours
4ApprovalYou confirm the specification finish and marking
5ProductionAbout 25 days for new production or straight from semi-finished stock
6Quality ControlProof load dimensional and breaking strength checks per batch
7PackingAbout 7 days into cartons on pallets or your retail pack
8ShipmentSea rail air or express with documents handled in house
Trust Center

Real Photographs Of Real Work

Our own warehouse, our own furnace line and our own packing. No stock photography, no borrowed factory shots, and no certificate we cannot produce for the batch you are buying.

Warehouse interior with blue and orange pallet racks filled with cardboard boxes and goods on a green floor
Qingdao WarehouseRacked pallet stock across the rigging families. This is what makes a 15 to 20 day lead time possible on common lines and what lets an order sit free for two months while the rest of it is built.
Large industrial furnace glowing with bright orange flames and heat inside a factory
Heat Treatment FurnaceThe furnace line where forged components are heat treated. Quench and temper is the step that turns a forging into a rated component, and it is the step that cannot be inspected visually afterwards.
Glowing hot forged metal link on a roller conveyor inside a forge workshop
Forged Components Leaving The FurnaceA forged link on the roller conveyor at temperature. Batch traceability starts here, which is why the proof load and dimensional records reference the heat rather than the shipment.
Knowledge Center

Guides Written For The Person Placing The Order

Grade comparisons, wire rope construction, sling standards, inspection and chain selection. Written to help a buyer choose the right line, then linked straight to it.

Answers

Questions Buyers Ask Before The First Order

Lead time, payment, shipping and certificates, answered with the terms the company actually works to.

What is your lead time?
About 15 to 20 days for the many common categories we hold as semi-finished stock. For new production the cycle is about 25 days plus roughly 7 days of packing, so about 35 days in total before shipment.
How do I place an order?
Send your request by WhatsApp, email or phone. Someone contacts you within 24 hours to confirm details and quote. From there it runs: project study, quotation, approval, advance payment, production, full quality control, packing, shipment, balance, delivery.
What payment terms do you accept?
Wire transfer T/T and letter of credit at sight are the two we use most. For smaller amounts we also accept PayPal, Western Union and Alipay.
How do the goods ship?
Most orders go by sea because it is the cheapest option, and some destinations can go by rail, which is faster than sea and much cheaper than air. Air freight is available when the timing justifies it. Quote us C&F or CIF and we arrange it through our own freight forwarder.
Can you supply certificates for a lifting register?
Yes. A Material Test Certificate to EN 10204 3.1 is issued with the batch on request, working load limits are stamped on rated hardware, and proof load, dimensional and breaking strength records are kept per batch.
Will you take a mixed order across several product families?
That is the reason to buy from us rather than from eight specialist forges. Send the whole bill of materials, including the small lines, and we will quote it as it stands and ship it as one consignment.
Do you do OEM and private label?
Yes. Custom tonnage stamping, private label marking, custom finishes including zinc plating, powder coating and electrophoretic black, and retail or carton packing configured to your warehouse.

Send Us The Bill Of Materials

Paste the line list into WhatsApp, or email the drawing. You get a reply within 24 hours from someone who can tell you which lines are in stock and which need production time.

We reply within 24 hours on WhatsApp or by email. Send a drawing, a photo or a bill of materials and we will quote it as it stands.