
Production Follow Up After The Sample Is Approved
Once the sample is confirmed and the order is placed, production follow up begins, and it usually takes longer than finding the supplier did: weeks, sometimes months. Most buyers cannot spend that time watching a line on the other side of the world. Your agent coordinates with the manufacturer so the goods are produced the way you specified, and tells you early when they are not.
What Follow Up Gives You Back
- Weeks of your own time returned, because someone local is watching the line instead of you
- Problems surfaced while there is still production time to fix them rather than at the port
- A personal agent coordinating with the manufacturer against your written specification
- Free quality inspection of the goods in our warehouse, with problems resolved before they leave China
- Cargo shipping arranged all the way to your address or your fulfilment centre with import and export handled
- Competitive freight because we ship out large volumes daily by express sea and air
- Two months of free warehouse storage in China so you can consolidate more products into one shipment
The Gaps Follow Up Closes
Between an approved sample and a delivered pallet there are four places an order quietly goes wrong.
Drift From The Sample
Problem. The approved sample sits in your office while production runs to whatever the line supervisor remembers.
How we solve it. Your agent coordinates with the manufacturer against the written specification and the approved sample so the run matches what you signed off.
Silent Delay
Problem. A tooling problem or a material delay does not reach you until the ship date has already passed.
How we solve it. Following up in person means a slip is reported while there is still time to reschedule the shipment or re-plan the run.
Quality Found Too Late
Problem. Defects discovered after the container lands are yours to deal with, at your cost, in your market.
How we solve it. We check quality in our own warehouse in China for free and get problems resolved before the goods leave the country.
Fragmented Shipping
Problem. Lines finishing at different times ship separately, multiplying freight cost and paperwork.
How we solve it. Goods can sit in our warehouse free for two months while the rest of the order is built, then ship together on one set of documents.
How Follow Up Runs
From approved sample to goods on the water, with a person attached to each step.
Included At No Extra Charge
- Quality inspection of the goods in our China warehouse, with quality problems resolved before shipment
- Cargo shipping arranged from China to your address or fulfilment centre, with the import and export process handled
- Competitive freight rates on express, sea and air because of the volume we ship daily
- Two months of free warehouse storage in China so several orders can be consolidated into one shipment
Product Families This Covers
Industries We Run This For
Production Follow Up FAQ
How long does production follow up take?
What does the follow up service cost?
Can you follow up an order at a factory I found myself?
What happens if the goods fail your warehouse check?
Can you ship to a fulfilment centre rather than to us?
How is progress reported?
Put Somebody On The Line
Send us the factory, the approved sample and the specification. Your agent coordinates production, checks the goods in our warehouse for free, and ships when the order is complete.
We reply within 24 hours on WhatsApp or by email. Send a drawing, a photo or a bill of materials and we will quote it as it stands.