Rice milling machines staged in sequence on the TITAN workshop floor before shipment
Project Reference

Rice Milling Line Assembled And Staged in Hefei

A complete paddy to white rice line built for a milling client, staged in the Hefei workshop in process order before packing. The client is not named.

The Challenge

What The Site Needed

Machines from different sections normally arrive on a site in the order the trucks were loaded. Fitting them together for the first time on the customer's floor costs weeks.

Customer Pain Points

  • Section capacities that do not match once installed together
  • Elevator heights discovered to be wrong after the building is up
  • Interfaces between machines improvised on site
  • Training happening after the line is already running badly
Our Solution

What Was Supplied

The line was assembled and staged in process order in the workshop, so the sequence, the transfer points and the elevator heights could be checked against the layout drawing before anything was packed.

On Site And In The Factory

Project Photographs

Rice milling machines staged in sequence on the TITAN workshop floor before shipment
Rice milling machines staged in sequence on the TITAN workshop floor before shipment
Rotary cleaning machine being assembled in the workshop with panels open
Rotary cleaning machine being assembled in the workshop with panels open
Pneumatic paddy husker with touch screen control ready for dispatch
Pneumatic paddy husker with touch screen control ready for dispatch
Fabrication

Manufacturing Process

  • Cleaning, destoning, husking, separating, whitening and grading machines built to one capacity figure
  • Machines staged in process order and the transfer points checked
  • Electrical panels wired and function tested
  • Wear parts for the first season packed with the line
Supply Chain

Shipping And Sequencing

Rubber rollers, emery rollers and screens packed with the line so the mill starts the season with its own spares on the shelf.

Quality Control

Checks That Were Made

Each machine run tested individually, then the section capacities cross checked against the line drawing before packing.

Result

What The Plant Got

A line that goes up in installation order on site, supervised by TITAN engineers through mechanical and electrical commissioning.

Customer Benefit

Why It Matters Day To Day

Fewer surprises during erection and an operator team trained on the line they will actually run.

Have A Similar Site

Send photographs of your site and the capacity you need. We will tell you what is realistic before anyone quotes.