Cast · Forged · Machined machinery parts sourced from China and delivered worldwide [email protected] +86 187 7103 6713
Quality Control and NDT at Eurona

Quality Control and NDT

Inspection planned before production, not improvised after the parts are cast.

Overview

What This Covers

Eurona runs a quality management system based on ISO 9001 covering supplier management, raw material inspection, production process control and final inspection. The team has UT, MT and PT non destructive testing capability and can meet verification requirements for demanding castings and critical structural parts.

Process

The Stages In Order

Standards and Documents

Standardise key processes and agree the quality documents before the first part is made.

Material and Process

Control raw material, process, dimensions and NDT through the production route.

Independent Testing

Use independent inspection equipment and archive the inspection results.

Traceable Records

Keep inspection records traceable and auditable after delivery.

Quality Control and NDT in practice at Eurona
Inspection planned before production, not improvised after the parts are cast.
Why It Matters

Decisions Taken At The Right Stage Cost Almost Nothing

  • Drawing review is where a casting can become a forging or a weldment can become one part.
  • Supplier matching is where process fit is weighed against price ranking.
  • Process control is where inspection turns a specification into a delivered part.
  • Logistics is where packing is designed around the destination, not around the factory.
FAQ

Quality Control and NDT — Frequently Asked Questions

Is this a separate paid service?

No. These stages are how every overseas order is run. They are described separately here so that buyers can see which decisions belong at which point.

Who is the point of contact during a project?

A technical sales contact covering the relevant process family, supported by the quality and logistics teams. Contact details for each area are listed on the about page.

Can you work with our own inspection agency?

Yes. Third party testing can be arranged, and inspection scope and reporting are agreed during drawing and standard review.

Start With A Drawing Review

Send the drawing, material, quantity, quality standard and target date, and the review comes back with a process route and a production base recommendation.