Drawing to Delivery Sourcing
One route from a drawing to a packed and documented shipment, instead of five separate purchases.
What This Covers
Most overseas buyers do not want to manage a foundry, a heat treatment shop, a machine shop and a forwarder separately. This solution puts the whole chain behind one contact, following the four project stages Eurona uses on every overseas order.
The Stages In Order
Requirement and Drawing Review
Confirm the application industry, material, process, dimensions, tolerances, inspection standard and delivery terms.
Supply Chain Matching
Select a stable production base according to the product characteristics and assess its production and inspection capability.
Process Control and Inspection
Follow key processes, raw material, NDT, dimensional inspection and final quality documents.
Logistics and Delivery
Arrange export shipment under agreed trade terms with a reliable and economical logistics solution.
Decisions Taken At The Right Stage Cost Almost Nothing
- Drawing review is where a casting can become a forging or a weldment can become one part.
- Supplier matching is where process fit is weighed against price ranking.
- Process control is where inspection turns a specification into a delivered part.
- Logistics is where packing is designed around the destination, not around the factory.
Process Families Covered
Steel Castings and Forgings
Heavy load and high strength steel parts from 50 kg to 50 tonnes, covered by melting records, heat treatment, NDT and full quality documents.
Process FamilyPrecision Casting
Silica sol lost wax and quick-drying investment casting from 0.01 kg to 300 kg, holding CT5 - CT9 and Ra 3.2 - Ra 6.3.
Process FamilyCast Iron
Grey iron, ductile iron and ADI castings from 0.2 kg to 2000 kg in green sand, resin sand and shell moulding.
Related Services
Supplier Qualification and Audit
Choosing the production base is the decision that fixes quality, cost and lead time for the life of the part.
SolutionQuality Control and NDT
Inspection planned before production, not improvised after the parts are cast.
SolutionSample and New Part Development
Turning a requirement into a stable, producible and inspectable manufacturing plan.
SolutionExport Logistics and Delivery
Packing, documents and shipment handled as part of the part, not as an afterthought.
Drawing to Delivery Sourcing — Frequently Asked Questions
Is this a separate paid service?
No. These stages are how every overseas order is run. They are described separately here so that buyers can see which decisions belong at which point.
Who is the point of contact during a project?
A technical sales contact covering the relevant process family, supported by the quality and logistics teams. Contact details for each area are listed on the about page.
Can you work with our own inspection agency?
Yes. Third party testing can be arranged, and inspection scope and reporting are agreed during drawing and standard review.
Start With A Drawing Review
Send the drawing, material, quantity, quality standard and target date, and the review comes back with a process route and a production base recommendation.