Mine-owned nepheline syenite and feldspar since 2007
Fired whiteness disc pressed from sodium feldspar
Defect Troubleshooting

Poor Glaze Adhesion: How Flux Selection Improves Glaze-Body Bonding

When glaze chips off or peels from the ceramic body — fix the intermediate layer chemistry using proper flux materials.

Poor glaze adhesion — where the glaze chips, flakes, or peels from the body surface — results from inadequate chemical and mechanical bonding at the glaze-body interface.

Understanding This Defect

The flux in both body and glaze affects this bond: insufficient body vitrification leaves a rough, porous surface that the glaze cannot properly wet; mismatched expansion puts the interface under stress; and poor engobe composition creates a weak intermediate layer. Solutions: increase nepheline in the body by 2-3% to improve surface vitrification for better glaze wetting; ensure the engobe contains adequate flux (15-20% nepheline K200) for proper maturation; check expansion compatibility between body and glaze using our expansion matching recommendations (nepheline in body + K-feldspar in glaze). For sanitaryware where glaze adhesion is safety-critical, our combination of K200 in the body + SY101 in the glaze provides proven reliable bonding..

Solution & Prevention

Third-party particle size distribution report for K100
Third-party particle size distribution report for K100
FAQ

Questions on This Topic

What does Poor Glaze Adhesion: How Flux Selection Improves Glaze-Body Bonding cover?

Poor glaze adhesion — where the glaze chips, flakes, or peels from the body surface — results from inadequate chemical and mechanical bonding at the glaze-body interface.

What is the lead time?

Production runs 7-14 days from order confirmation. Standard grades are normally held in stock, so container loading often starts within 3-5 working days.

Can I visit the factory?

Yes. Please book at least three working days ahead. Airport pickup can be arranged from Zhengzhou (CGO) or from Anyang station.

Which ports do you ship from?

FOB Tianjin, Qingdao or Lianyungang, all within 6-8 hours by truck from the plant. CIF to your destination port is also quoted on request.

Take It From Reading to Testing

Send your current specification and the problem you are chasing. Samples follow within a week.