Chain For Ferraro Compacting Machines
Chain built for Italian Ferraro compacting machines rather than for a stenter frame.
View Details



Lightweight Monforts chain built with standard bushes rather than PEEK, for lines that do not need the upgrade.
The third Monforts chain build in our range: lighter and stronger materials for smooth running on the track, high quality bearings and a long service life, but with standard bushes rather than PEEK.
It consists of connectors, U-shaped connectors, pins, bushes, screws, wear sleeves and other components, all of which we also sell individually. This is the build for lines that want the lighter chain but do not need PEEK, which keeps the cost down.
| Machine | Monforts stenter, oil-free guide |
|---|---|
| Bush | standard |
| Bearings | high quality |
| Weight | approx 0.6 kg |
| Colour | silver |
| Lead time | within 7 days for standard items |
| Origin | Shaoxing, Zhejiang, China |
Against the PEEK builds, this costs less and is entirely adequate on lines with a disciplined maintenance routine. Where the line runs hot and dirty, or where annual cleaning slips, the PEEK bush earns its price back in service life.
Commit to the annual clean and grease before choosing standard bushes over PEEK
Check guide rail condition before fitting
Clean the guide and chain at least once a year
Use a high temperature grease such as DuPont, Miller or Kluber
Gauge chain elongation annually to plan the next renewal
Standard bushes are fine on lines with a reliable annual clean and grease. PEEK is self-lubricating and more wear resistant, so it is the better choice where maintenance intervals slip or the line runs hot and dirty.
Yes, it uses lighter and stronger materials so the chain runs more smoothly on the track. The difference from Type 2 is the bush specification.
Yes. PEEK bushes are sold separately and can be fitted at a later service.
Connectors, U-shaped connectors, pins, bushes, screws, wear sleeves and other components. We sell all of them individually.
Clean the guide and chain at least once a year and add a high temperature grease.
Confirmed at quotation, since chains are built to length.
Chain built for Italian Ferraro compacting machines rather than for a stenter frame.
View Details
Chain built for Italian Lafer compacting machines, made to sample.
View Details
Third Bruckner chain build, completing the set we hold for Bruckner frames.
View Details
Second Bruckner chain build, for frames whose chain geometry differs from Type 1.
View DetailsThe stenter heat-sets and dries fabric by stretching it to width and holding it there under controlled heat.
Entry section, clip or pin chains, rails, heating chambers, exhaust, blowers, temperature control, width adjustment and weft straightener.
Clips leave no pin marks and suit thicker fabrics; pins hold more tension and run faster, to 100 m per minute.
Seat profiles and geometry changed across frame generations, so the part itself is more reliable than a model number. We identify it and quote the matching specification.