Skip to content
Pumps tanks mixers and sanitary fittings built in Wenzhou since 2002
CNC turning centre used for pump shafts and sealing faces

Documentation

The Documents That Ship With The Equipment

For food, pharmaceutical and pressure vessel projects the paperwork is part of the deliverable. This is what the works issues, and how to ask for it.

Standard Documentation Package

Standard Documentation Package

Issued with the equipment. Ask for any item early if your approval process needs it before delivery.

General Design Specification

The design basis for the unit: duty, materials, design pressure and temperature.

Request

General Arrangement Drawing

Dimensions, nozzle orientation, motor position and mounting details for approval before build.

Request

Operation And Maintenance Manual

Commissioning steps, run-in checks, lubrication, seal replacement and spares list.

Request

P And ID Diagram With Parts List

Process and instrumentation diagram for skid mounted and tank systems, with the parts list.

Request

Electrical And Pneumatic Diagram With Parts List

For units supplied with control panels, actuated valves or level instrumentation.

Request

Pressure Vessel Certificate

Copy issued where the vessel is built under a pressure vessel code.

Request

Manual And Certificate Of Bought-Out Items

Motor, gearbox, seal and instrument documentation from the component suppliers.

Request

Factory Acceptance Test Record

The record of the works test carried out before the equipment is painted and packed.

Request

Qualification Documentation

Qualification Documentation Package

Optional package for regulated projects. Tell us at enquiry stage, because some protocols are written before the build starts.

Installation Qualification Protocol

IQ protocol and executed record for the installed equipment.

Request

Operational Qualification Protocol

OQ protocol covering the operating range the equipment is verified against.

Request

Performance Qualification Protocol

PQ protocol for performance against the process requirement.

Request

Design Qualification

DQ document tying the design back to the user requirement specification.

Request

Calibration Certificate For Critical Instruments

Certificates for gauges, transmitters and temperature instruments supplied with the unit.

Request

Site Acceptance Test

SAT protocol for testing after installation at your plant.

Request
Documentation binders with installation qualification and test report covers
Installation qualification protocol and test report as they ship with a vessel order.

Drawings And CAD Files

CAD files are not published for open download. Tell us the model and the format you need, STEP, DWG or PDF, and we will send the file that matches the unit you are buying rather than a generic one.

Ask For Drawings By Email

Answers

Documentation FAQ

Why is nothing downloadable directly?

Because a generic PDF is rarely the document you need. Drawings and datasheets are issued against a model and a duty point, so we send the file that matches your unit.

How quickly can I get a datasheet?

Usually the same working day for a catalogue model. Custom vessels need the duty confirmed first, because the drawing is made for the order.

Can you complete our own document templates?

Yes. Send your vendor document requirement list with the enquiry and we will price the documentation work with the equipment.

Do you provide material certificates?

Material certificates for wetted parts can be supplied with the order. Ask for them at enquiry stage so the material is traced from the start.

Is the documentation in English?

Yes, the standard package is issued in English.

Ask For The Document You Actually Need

Name the model and the document. It comes back by email, not through a download gate.