Slatted Floors
LW Plastic Slat
LW-series PP slat floor with wide drainage gaps and a saw-tooth anti-slip face, made in spans from 200 to 600 mm.
By animal stage
Where the weight is. Flooring, penning and feeders specified for animals that push, and for the feed conversion the house is judged on.
Pain points
Every kilo on the slat is the most expensive thing in the building.
Panels specified for weaners do not hold a finishing group.
A gap sized for piglets clogs when the animals are 100 kg.
Steel and concrete both have a service life in a slurry pit; FRP does not.
Finishing rooms are a load problem. The LW slat pattern moves heavier manure; FRP T and I beams carry the floor across the pit with no corrosion; 1200 mm PP panels in reinforced grade hold the pen front through the feeding rush, in carbon black where the house is curtain-sided.
Feeding is where the money is: a maxi pan feeder with a stainless adjustment that holds its setting, fed through an anti-bridge hopper and a trumpet drop pipe so feed lands spread across the pan rather than heaped on one side of it.
Send us three numbers
Room dimensions, animal stage and target capacity are enough for our engineers to return a layout and an equipment list.
Start a specificationRecommended equipment
Slatted Floors
LW-series PP slat floor with wide drainage gaps and a saw-tooth anti-slip face, made in spans from 200 to 600 mm.
FRP Beams
Fibreglass I-profile support for the wide slat spans used in grow-finish and gestation rooms.
FRP Beams
Pultruded fibreglass T-beam that carries plastic and cast-iron slats across the manure pit and does not corrode doing it.
PP Panel
Black PP pen panel in the tall 1200 × 1000 × 50 mm size, for the positions that take the most light and the most wear.
Feeding
Large-capacity pan feeder with a stainless adjustment for grow-finish pigs, set to deliver feed without spilling it.
Feeding
Drop hopper that channels feed cleanly from the line into the pan or trough below.
Feeding
Trumpet-mouth drop pipe in Ø60 and Ø75 mm that spreads feed evenly across the pan instead of dropping it in one place.
Drinking
Robust drinker bowl with a float valve, so water is there when the animal wants it and nowhere else.
Supply options

Give us the building and the herd flow. We engineer the equipment package and supply it as one accountable project.

The floor and everything that carries it, specified as one system: slat pattern, span, beam section, feet and edge details.

Your pen layout returned as a counted schedule: panels, posts, brackets, connectors, channel and gates, crated by room.

Feeding and drinking specified together, from the regulator at the room entry to the pan at the pen front.
Related reading
Design GuideThe gap in a slatted floor is a compromise between drainage and foot support. This is how to decide which way to lean in each room.
Installation GuideA slat floor that is set out correctly takes a day. One that is not takes a week and never quite sits flat. Here is the order of work.
Comparison ArticleWhatever carries the slat floor spends its life in the worst atmosphere in the building. Three materials are used for the job, and only one of them is indifferent to it.
Answers
The LW slot pattern. Its wider gap moves the heavier manure a finishing pig produces.
Control the last half metre: an anti-bridge hopper, a trumpet drop pipe that spreads feed across the pan, and a pan adjustment that holds its setting.
1200 mm in reinforced grade, in carbon black where the panel sees daylight through a curtain or open end.
There is no metal in the laminate to corrode and no coating to fail, which is why they are specified to outlast the floor above them.
Talk to an engineer
Slats, beams, penning, feeders, drinkers and fans are made on the same site and crated by room, so the build order is the unload order.