
Empty-container-handler-spreader
Enhance your container handling operations with the HLS40ft Empty Container Stacker Spreader. Designed for efficiency, it accommodates standard 20ft and 40ft empty containers, offering telescopic extension, lateral movement, and
- ISO Container Sizes
- 1 X 20FT Empty Container, 1 X 40FT Empty Container
- Rated Load
- ≤8 tons
- Self-weight
- 3.5 tons
- Side Shift
- ± 600 mm
- CE Certification
- Include
Quotation in 24 hours · CAD drawing in 48 hours · FEM / DIN / ISO design
Product Overview
<
p
>
Technical Features
- Full block stacking with enhanced visibility
- Quick handling of 20′ to 40′ containers with dampening for maximum speed
- Equipped with ISO twistlocks for secure container attachment
- ± 600 mm side shift with smooth control technology
- 250mm flexible floating function for easy container alignment
- ±2° self-leveling capability for improved stability
- Long service intervals contributing to an extended economic life
Where It Is Used
- APPLICATION: Empty Container Handler, Reach Stacker
Specifications
Values below are the published standard configuration. Anything outside this range is a customisation question, not a catalogue lookup.
| ISO Container Sizes | 1 X 20FT Empty Container, 1 X 40FT Empty Container |
|---|---|
| Rated Load | ≤8 tons |
| Self-weight | 3.5 tons |
| Side Shift | ± 600 mm |
| CE Certification | Include |
| Model | HLS40ft |
|---|---|
| Rated load | ≤8tons |
| Self weight | 3.5 tons |
| Transfer pin type | ISO floating transfer pin, hydraulic cylinder drive |
| Telescopic form | hydraulic cylinder telescopic drive |
| Side shift mechanism | hydraulic cylinder telescopic drive |
| Power supply voltage/frequency | AC 380(3P)/50Hz |
| Allowable eccentric load | ±10% |
| Vertical floating stroke of resale box | 200mm |
| Opening and closing time | ~1s |
| Telescopic time (20ft~40ft) | ~25s |
| Side shift ±600 | ~15s |
Quality Control
Raw steel arrives with a Material Test Certificate and is spot inspected. Welders hold Class I international qualification. Girders are shot blasted to Sa2.5 before paint, and paint thickness is checked.
Customisation
Capacity, span, lifting height, duty group, power supply, control mode and service environment are all specified per order. Special products customisation is a standard service.
Documentation and Support
Equipment and main parts qualification certificates, electrical drawing diagram, installation operation and maintenance manual, and commissioning instructions ship with the equipment. Online support runs 24/7.
Use Guide
- Confirm the duty group. Count average lifts per hour and average load, not peak tonnage. This sets the FEM classification and drives the whole design.
- Check the building. Wheel load, headroom and hook approach decide whether the unit fits. Ask for the CAD drawing before ordering.
- Specify the environment. Temperature, dust, humidity and any hazardous area classification change the motor, brake and enclosure rating.
- Plan the power supply. Long travel needs a conductor rail or festoon system, which is quoted separately and must match the runway length.
- Book commissioning. Installation supervision or online commissioning support, plus operator training, before the unit goes into production.
Related Products

Hydraulic-container-spreader
- ISO Container Sizes
- 20ft, 40ft, 45ft
- Telescopic Switching
- Between 20-foot and 40-foot Positions

Electric-fixed-container-spreader
- ISO Container Sizes
- 1 X 20FT, 1 X 40FT
- Spreader Control
- Mechanical or Semi Automatic

Electric-telescopic-spreader
- ISO Container Sizes
- ISO Standard 20’, 40’ and 45’ containers
- Spreader Control
- Mechanical

Mast-mobile-container-crane
- Maximum Lifting Weight
- 40t
- Maximum Lifting Height
- 1~10m or Customized
Frequently Asked Questions
What information do you need to quote a empty-container-handler-spreader?
Capacity, span rail centre to rail centre, lifting height, duty or working condition, power supply, travel distance and the service area conditions. A workshop drawing speeds it up considerably.
Can the empty-container-handler-spreader be customised?
Yes. Sinomac provides a special products customisation service, and free production drawings for regional partners and clients buying crane kits.
How long does a quotation take?
A quotation is issued within 24 hours and a CAD drawing within 48 hours, both free of charge.
What testing is done before shipment?
Every hoist is pre-commissioned before packing and the crane is pre-assembled for a factory acceptance test. A third party inspection can be arranged at your request.
Are your cranes built to FEM and DIN standards?
Yes. Sinomac designs to FEM, DIN and ISO. Duty group is set from your real lifting cycle, so the classification on the nameplate matches how the crane is actually used.
Can you supply a crane kit instead of a complete crane?
Yes. Sinomac supplies hoist, end carriages, drives, control system and anti-sway as a kit, and provides free production drawings of the girder for regional partners and clients buying kits, which lowers shipping cost.
Request a Quotation for the Empty-container-handler-spreader
Send capacity, span, lifting height and duty. A quotation follows within 24 hours.
