Dongguan JEC Mold Co., Limited · ISO 9001:2015
Plumbing & Fluid Handling tooling by JEC Mold
Industry

Plumbing & Fluid Handling Tooling and Molded Parts

Connectors manifolds and valve bodies for circuits that have to hold pressure

The Pain

What This Sector Gets Wrong

Fluid parts fail at the interface. Barbs, threads and sealing faces are all formed by tool details that have to move out of the part cleanly, and every extra side action is another place for flash to start.

What Buyers Need

  • Side actions that are proven before the tool is cut
  • Thread and barb forms that release without drag marks
  • Matched tolerances across a family of fittings
  • A tool that can be re-cut locally rather than replaced

What We Deliver

  • Mold motion simulation for multi-action tools
  • Full 3D design in STEP, IGES, Parasolid, CATIA or SolidWorks
  • Precision CNC and EDM machining of slide and core details
  • Final mold inspection and packing inspection before shipment
Delivery

How a Plumbing & Fluid Handling Program Runs With Us

  1. Enquiry

    3D data, resin, annual volume and mold standard. Quotation back within two working days.

  2. Engineering

    Full 3D design, DFM for comment, MoldFlow study and, where needed, motion simulation.

  3. Build

    CNC and EDM machining with inspection at incoming material, electrode and post-machining stages.

  4. Release

    Trial report and sample dimension report, then final mold and packing inspection.

FAQ

Plumbing & Fluid Handling Buyers Ask

Have you tooled for the plumbing & fluid handling sector before?

Yes. The parts shown on this page are our own work in that sector: clear medical optical cover, transparent medical cassette housing, blue medical connector cap.

What engineering comes before the tool is cut?

A written DFM for your comment, a practical MoldFlow study on mass production molds, and for multi-action tools a mold motion simulation that steps through open to close.

Which mold standards do you work to?

Your own standard, or DME, Meusburger, HASCO, Progressive or MISUMI. Our senior designers read customer standards and special requirements in English.

What arrives with the tool?

Mold trial reports with a sample dimension report, after which the tool passes final mold inspection and packing inspection before shipment.

Can you second-source an existing tool for this sector?

That is a normal request. Send the existing 3D data and the part drawing and we will quote a new tool against it within two working days. Transfer of an existing physical tool: TBC per project.

Start a Plumbing & Fluid Handling Tooling Enquiry

Send the part, the resin and the volume. You will have a professional quotation with technical comment within two working days.