



Industrial Compost System
10 Tons Industrial Composter
10 tonnes a day, SUS304 construction, 65-75 degrees C fermentation
The CR-10T industrial composter handles up to 10 tonnes of organic waste a day and is built in SUS304 stainless steel throughout. Waste is loaded into the fermentation bin after unloading, crushing, solid-liquid separation and oil-water separation; the system then holds high-temperature fermentation with auxiliary heating between 65 and 75 degrees C, with continuous gap stirring keeping fresh air in the chamber. Food waste becomes compost in about 24 hours with waste volume reduced by 80-90%, and compost is removed weekly for conversion into a tailored organic fertilizer.
No forms. Message us on WhatsApp or by email and you will be talking to the factory in Suzhou.
What it solves
- Centralised facilities processing ten tonnes a day of mixed organics
- Food waste going straight to landfill and generating methane
- Soil losing the nutrients locked up in organic waste
- Transport emissions from moving wet waste to a distant facility
Key benefits
- 10 tonnes/day processing capacity - the largest system in the range
- SUS304 stainless steel construction throughout
- High-temperature fermentation held between 65 and 75 degrees C with auxiliary heating
- Continuous gap stirring maintaining aerobic conditions
- 80-90% waste volume reduction, compost in around 24 hours
- Integrated pre-treatment: crushing, solid-liquid separation, oil-water separation
- 380 V, 50 Hz at 160 kW; 13,000 kg; 14758 x 5520 x 3420 mm
Technical data
| Model | CR-10T |
|---|---|
| Processing Capacity | 10tons/day |
| Dimension (L*W*H) | 14758*5520*3420mm |
| Weight | 13000KGS |
| Rated Power | 160KW |
| Power Supply | 380V, 50Hz |
| Decomposition Method | Microbial Decomposition (Need to add bacteria) |
| Waste Volume Reduction | ≥85% |
| Processing Time | 12-24 Hours |
| Output | Organic Fertilizer |
| Material | SUS304 |
| Deodorization | Internal deodorizationr or optional extra deodoriser |
| Operating Environment | Indoors normal temperature (ventilated) / Outdoor shelters are required |
| Control System | Fully Automatic Intelligent Control, Automatic Fault Alarm |
Technical features
- SUS304 construction on the fermentation system
- Microbial decomposition with bacteria added to the charge
- Auxiliary heating maintaining 65-75 degrees C fermentation
- Continuous gap stirring for oxygen supply
- Fully automatic intelligent control with automatic fault alarm
- Indoors at normal temperature and ventilated, or outdoors under shelter
- 380 V, 50 Hz, 160 kW
Who it is for
Municipalities, waste management companies and agribusinesses building a centralised ten-tonne-a-day organics facility with resource recovery built in.
Where it is used
- Centralised municipal organics processing
- Regional waste management contracts
- Large agricultural and agribusiness operations
- Industrial food production campuses
Quality control
Facilities at this scale are custom-designed and built to the capacity and operating requirements of the site. Fabrication, welding and control build are inspected in stages, and commissioning covers the bacteria charge, fermentation temperature profile and stirring regime.
Customisation
The system is engineered per project - capacity requirement, pre-treatment line, deodorisation, heat recovery, control integration and layout. Creeks wraps the standard stainless build in a design specified with the client.
How it is operated
- Agree capacity requirement and facility layout with the engineering team
- Prepare the building or sheltered pad and the power supply
- Install the pre-treatment line - crushing, solid-liquid and oil-water separation
- Charge bacteria and commission the fermentation temperature profile
- Load the fermentation bin daily up to 10 tonnes
- Remove compost weekly and send it for conversion into tailored organic fertilizer
How it compares
CR-10T is twice the capacity of CR-5000 and built in SUS304 rather than coated Q235, with an integrated pre-treatment line. Below five tonnes a day, CR-2000 to CR-5000 cover the industrial band; below two tonnes, the commercial CR series applies.
Frequently asked questions
How is waste prepared before fermentation?
Workers load waste after unloading, crushing, solid-liquid separation and oil-water separation - the pre-treatment line is part of the system.
What temperature does the fermentation run at?
The warehouse temperature is held between 65 and 75 degrees C with auxiliary heating, and continuous gap stirring keeps fresh air in the chamber.
How often is compost removed?
Weekly. It is then sent to the soil centre to be converted into an organic fertilizer tailored to the operation.
Why SUS304 rather than coated steel?
At ten tonnes a day in continuous high-temperature service, stainless steel is what keeps the fermentation chamber durable and cleanable.
Is every CR-10T the same?
No. Facilities at this scale are custom-designed and built to suit specific needs and capacity requirements.
What are the utilities?
380 V, 50 Hz at 160 kW rated power, with an installed weight of 13,000 kg over a 14758 x 5520 x 3420 mm footprint.
Can bacteria be sourced locally?
The microbial charge is specified with the system; replenishment arrangements are agreed at commissioning.
Quote for the 10 Tons Industrial Composter
Tell us your daily waste volume, power supply and destination port. We reply with a specification and price.



