



Industrial Compost System
CR-5000 Composting System
5000 kg/day composting system for municipal and industrial plants
CR-5000 is a five-tonne-a-day composting system: 80 kW on 380 V three phase, 6800 kg, 5470 x 3510 x 2730 mm. It runs microbial decomposition on a 12 to 24 hour cycle with at least 85% volume reduction, discharging organic fertilizer. Systems at this scale are designed into a facility - with a feeding arrangement, a deodorisation strategy and a maintenance plan agreed before manufacture.
No forms. Message us on WhatsApp or by email and you will be talking to the factory in Suzhou.
What it solves
- Five tonnes a day of organics arriving at a facility with no processing line
- Regional programmes diverting household and commercial food waste
- Large processors whose organic waste is a daily production output
- Landfill dependence that a municipality has committed to reduce
Key benefits
- 5000 kg/day processing capacity
- 12-24 hour microbial cycle producing organic fertilizer
- At least 85% waste volume reduction
- 380 V, 50 Hz three phase at 80 kW
- Internal deodorisation with optional external deodoriser
- Fully automatic intelligent control with automatic fault alarm
- 6800 kg, 5470 x 3510 x 2730 mm
Technical data
| Model | CR-5000 |
|---|---|
| Processing Capacity | 5000kgs/day |
| Dimension (L*W*H) | 5470*3510*2730mm |
| Weight | 6800kgs |
| Rated Power | 80KW |
| Power Supply | 380V, 50Hz |
| Decomposition Method | Microbial Decomposition |
| Waste Volume Reduction | ≥85% |
| Processing Time | 12-24 Hours |
| Output | Organic Fertilizer |
| Deodorization | Internal deodorizationr or optional extra deodoriser |
| Operating Environment | Indoors normal temperature (ventilated) / Outdoor shelters are required |
| Control System | Fully Automatic Intelligent Control, Automatic Fault Alarm |
Technical features
- Microbial decomposition with continuous gap stirring
- Internal deodorisation or optional extra deodoriser
- Fully automatic intelligent control, automatic fault alarm
- Indoors at normal temperature and ventilated, or outdoors under shelter
- Engineered feeding and discharge arrangements
- 380 V, 50 Hz, 80 kW
Who it is for
Municipalities, waste management companies and large processors building a five-tonne-a-day organics line.
Where it is used
- Municipal organics processing facilities
- Regional waste management operators
- Large-scale food manufacturing sites
- Agribusiness operations converting waste to soil amendment
Quality control
Structural fabrication and drive alignment are inspected in stages, the control system is built and tested against the project specification, and a loaded factory run is completed before the system is crated. Records are retained against the serial number.
Customisation
Feeding line, pre-treatment, deodorisation, control integration, supply configuration and site layout are engineered to the project. Creeks issues layout and lifting drawings before manufacture.
How it is operated
- Agree facility layout, feeding and discharge arrangements
- Prepare the pad and services, then position with lifting equipment
- Connect three-phase power and commission the microbial charge
- Operate at up to 5000 kg per day
- Automatic decomposition runs 12-24 hours per cycle
- Discharge fertilizer and follow the planned maintenance schedule
How it compares
CR-5000 is the largest of the CR-series industrial composters before the 10-tonne CR-10T, which steps up to SUS304 construction and a 14.7 metre frame. CR-3000 covers three tonnes a day at 50 kW.
Frequently asked questions
Is CR-5000 a machine or a facility?
It is an engineered system. Feeding, deodorisation, control integration and maintenance are designed into the facility before manufacture.
What supply does it need?
380 V, 50 Hz three phase at 80 kW rated power.
What is the footprint?
5470 x 3510 x 2730 mm with an installed weight of 6800 kg, plus access and service clearance.
How much volume is removed?
At least 85%, with organic fertilizer discharged as the product.
Can it be installed outdoors?
Yes, under shelter. Indoor installation needs normal temperature and ventilation.
What is the lead time?
Confirmed with the project quotation, since layout drawings are agreed before manufacture.
Is remote monitoring available?
Control integration is part of the project engineering - tell us what your operations team needs to see.
Quote for the CR-5000 Composting System
Tell us your daily waste volume, power supply and destination port. We reply with a specification and price.



