Injection moulds and moulded parts since 2000 22 Xianghong Road, Xiang An, Xiamen, China Tel +86 592 7760777
[email protected]
Injection moulding hall with presses running production
Solution

Injection Moulding Production

Running the tool for finished parts instead of shipping it away

Overview

What This Stage Covers

The plant runs injection machines below 600 tons, so a mould built in the tool room can go straight into production of finished parts. Buyers who want parts rather than tooling stop at this stage.

Process

Stage By Stage

Material and colour

The problem. A colour matched at the masterbatch supplier can still drift once it is run in the actual grade at the actual temperature.

How we handle it. Colour is approved on parts moulded from your grade in this tool, not on a chip.

Process setting

The problem. A setting sheet that lives in an operator's head disappears with the operator.

How we handle it. The approved setting is recorded against the mould number so that the next run starts from the same place.

Production run

The problem. Parts drift over a long run and nobody notices until the container is packed.

How we handle it. Parts are checked during the run against the same dimensions used at first article, not only at the start and the end.

Secondary operations

The problem. Degating, assembly and packing handled by whoever is free produce inconsistent parts.

How we handle it. Where a part needs degating or sub assembly it is defined as a step with its own check rather than left to the moulding operator.

Mould maintenance

The problem. A tool that is only cleaned when it fails loses its finish and then its cavity.

How we handle it. Tools are cleaned and the condition noted at the end of each run, so wear is caught before it reaches the part.

Deliverables

What You Receive

  • Approved first off parts from the production run
  • Recorded process setting against the mould number
  • In-process dimensional checks
  • Mould condition note at end of run
FAQ

Injection Moulding Production Questions

Practical questions about this stage of the work.

What is the largest machine you run?

The archived company profile records injection machines below 600 tons. That covers the sanitary, appliance and electronics parts in this catalogue. Send the projected area and shot weight and we will confirm whether the part fits the press.

Can you hold stock and ship against a schedule?

Tell us the call off pattern at enquiry. A part that ships monthly against a forecast is planned differently from one that ships once, and the difference belongs in the quotation.

Do you mould parts on tools built elsewhere?

Yes, provided the tool arrives with its drawings and a spare component set. We check it in the press first and report what we find before committing to a cycle time.

Start With Injection Moulding Production

Tell us where your project currently is and we will tell you what this stage would involve and what it would cost.