
Shipping And Payment
Shipped from Shenzhen in wooden case or export carton plus wooden box, on EXW, FOB, FCA, CFR, CIF, DDP or DDU terms.
How It Works In Practice
Lead time
Production and delivery normally 7 to 15 working days after the order is confirmed. Customised machines may run longer depending on complexity.
Packing
Wooden case packing as standard; export carton plus wooden box on the salt machines. The silver refining machine ships at 73 x 58 x 103 cm and 77 kg gross; the cyanide-free electroformer at 152 x 105 x 127 cm and 250 kg.
Terms
EXW, FOB, FCA, CFR, CIF, DDP and DDU are all quoted across the range. Port of dispatch is Shenzhen; some product records also list Yantian, Shekou, Guangzhou and Shanghai.
Payment
T/T bank transfer, PayPal, L/C and Western Union. Flexible terms can be discussed for long-term partners.
The Other Four
Custom Engineering
Size, capacity and function built to your production requirement rather than a catalogue number.
Complete Production Lines
Whole gold salt plants, whole plating lines and whole refining systems, specified as one set.
Environmental Compliance
Fume treatment, discharge limits and cyanide gas handling designed into the equipment.
Installation And Training
Online technical support, installation guidance, operation manuals and lifetime after-sales service.
Shipping And Payment
Send the requirement and we will answer it with a specification rather than a brochure.
