
Complete Production Lines
Individual machines are the easy part. The reason projects stall is the equipment nobody listed: the gas treatment unit, the tablet press, the RO water system. We quote the set.
How It Works In Practice
Gold salt, end to end
Gold potassium cyanide making machine, toxic gas treatment machine at 1000 mm diameter by 2400 mm, gold tablet press, refrigerator for cooling crystallisation, oven for drying, and RO water. Press, refrigerator and oven can be self-purchased or supplied by us.
Plating lines
The company provides design and manufacture of the entire production line, not only the single plating station.
Gold refining systems
Design and manufacture of the complete system around the titanium melting reactor, including the matching exhaust purifier.
One responsible supplier
Specifying the set together is what stops the ventilation being sized for the wrong machine.
The Other Four
Custom Engineering
Size, capacity and function built to your production requirement rather than a catalogue number.
Environmental Compliance
Fume treatment, discharge limits and cyanide gas handling designed into the equipment.
Installation And Training
Online technical support, installation guidance, operation manuals and lifetime after-sales service.
Shipping And Payment
Global shipping by sea, air or express, on T/T, PayPal, L/C or Western Union.
Complete Production Lines
Send the requirement and we will answer it with a specification rather than a brochure.
