Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Rubber & Plastic Pads › Ford Rubber Pads › F150 pads
F150 pads — large moulded rubber pad with a fine rib field and soft corners
F150 pads — photographed at Lee World. Large moulded rubber pad with a fine rib field and soft corners.
Ford Rubber Pads

F150 pads

A pickup pedal pad — physically larger than a passenger-car pad because the pedal itself is, and moulded in one shot with no metal insert.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyMoulded rubber part
ConstructionSingle-compound moulding, no metal insert
Face detailLarge moulded rubber pad with a fine rib field and soft corners.
Moulding compoundsEPDM, SBR, TPE, TPE-SEBS, PVC or PP, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Large moulded rubber pad with a fine rib field and soft corners. It sits in the Ford Rubber Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

One compound, one tool, one shot

The tread, the retaining geometry and any mounting holes or locating tabs are all formed in the tool rather than added afterwards. That is why the tool drawing and the part drawing are effectively the same document, and why a change to the face means a change to the tool.

Compound and hardness

We run EPDM, SBR, TPE, TPE-SEBS, PVC and PP with or without glass reinforcement. Oil or fuel contact rules EPDM out; weather and ozone rule SBR out. Shore A hardness decides how the part feels in use and belongs on the drawing, not in an email.

With no metal face, the compound is the part

There is nothing to hide behind. A pad that is too hard makes its tread pattern useless; one that is too soft wears through at the rib tips. Send the service conditions and our designers will propose a grade rather than asking you to guess one.

Questions buyers ask

Which compound will this part be moulded in?

Whichever the drawing calls for. We run EPDM, SBR, TPE, TPE-SEBS, PVC and PP with or without glass reinforcement; if you have not fixed a compound yet, send the service conditions and we will propose one.

How long before I see a real F150 pads sample?

Our prototype shop exists for exactly this. Parts from a prototype tool take 4 weeks; PPAP to ISO/TS 16949 or VDA, on production parts, is typically 8 weeks after that.

What do you need from us to quote it?

A drawing, or a physical sample we can measure. Our designers work in SolidWorks, Pro-E and UG, so a native or STEP file is enough to start.

How is the material verified?

Through the nine test methods we run in Beijing, and through CTI — Centre Testing International Corporation, Shanghai — where an accredited third-party result is required.

Quote the F150 pads

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.