Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Rubber & Plastic Pads › Standard Rubber & Plastic Pads › VW Pad 01
VW Pad 01 — pair of small moulded rubber pads with a plain raised face
VW Pad 01 — photographed at Lee World. Pair of small moulded rubber pads with a plain raised face.
Standard Rubber & Plastic Pads

VW Pad 01

Supplied as a pair, because on this pedal box the brake and clutch take the same small pad and buyers order them together.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyMoulded rubber part
ConstructionSingle-compound moulding, no metal insert
Face detailPair of small moulded rubber pads with a plain raised face.
Moulding compoundsEPDM, SBR, TPE, TPE-SEBS, PVC or PP, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Pair of small moulded rubber pads with a plain raised face. It sits in the Standard Rubber & Plastic Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

Tooling and first parts

All tooling is designed and made in house. Parts from a prototype tool reach you in 4 weeks, which is the window in which the face, the retention and the hardness can still be changed without restarting anything.

Getting it approved

Where the part goes onto a programme we run PPAP to ISO/TS 16949 or VDA, typically over 8 weeks, on parts from the production tool rather than on prototypes.

What we need to quote it

The drawing or the sample, the annual volume, and the service conditions the part sees. If the part already exists in this catalogue we will tell you that instead of quoting a new tool.

Questions buyers ask

What hardness should I specify?

Shore A hardness decides how the part feels and how fast the tread wears. Too hard and the pattern does nothing; too soft and the rib tips go first. Tell us the duty and we will propose a number to put on the drawing.

How long before I see a real VW Pad 01 sample?

Four weeks from a prototype tool. The tool shop is in the same buildings as the moulding lines in Shanghai and Beijing, so prototype work does not queue behind a subcontractor.

What do you need from us to quote it?

A drawing or sample plus the annual volume. Say at that point whether PPAP is required and to which standard — ISO/TS 16949 or VDA — so it is planned in rather than added later.

How is the material verified?

In our Beijing facility, next to the production line: Shore A hardness, density, ozone, ageing, tensile strength, elongation to fracture, vulcanization and insulation resistivity, oil resistance and Mooney viscosity.

Quote the VW Pad 01

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.