Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Rubber & Plastic Pads › Standard Rubber & Plastic Pads › VW Pad 02
VW Pad 02 — moulded rubber pad with a diamond lattice face inside a raised border
VW Pad 02 — photographed at Lee World. Moulded rubber pad with a diamond lattice face inside a raised border.
Standard Rubber & Plastic Pads

VW Pad 02

The raised border around the lattice is what holds the pad on the pedal arm — the pattern in the middle is grip, the rim is the fit.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyMoulded rubber part
ConstructionSingle-compound moulding, no metal insert
Face detailMoulded rubber pad with a diamond lattice face inside a raised border.
Moulding compoundsEPDM, SBR, TPE, TPE-SEBS, PVC or PP, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Moulded rubber pad with a diamond lattice face inside a raised border. It sits in the Standard Rubber & Plastic Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

What we need to quote it

The drawing or the sample, the annual volume, and the service conditions the part sees. If the part already exists in this catalogue we will tell you that instead of quoting a new tool.

Where it is moulded

Rubber parts are moulded at our Beijing plant in Lucheng, HuangCun Town, Daxing; plastic parts at the Shanghai plant on Huqingping Road, Qingpu District, which is also home to our R&D centre.

One compound, one tool, one shot

The tread, the retaining geometry and any mounting holes or locating tabs are all formed in the tool rather than added afterwards. That is why the tool drawing and the part drawing are effectively the same document, and why a change to the face means a change to the tool.

Questions buyers ask

Which compound will this part be moulded in?

Whichever the drawing calls for. We run EPDM, SBR, TPE, TPE-SEBS, PVC and PP with or without glass reinforcement; if you have not fixed a compound yet, send the service conditions and we will propose one.

How long before I see a real VW Pad 02 sample?

Prototype parts in 4 weeks. That window is also when design changes are cheap — our designers will suggest improvements to the part while the tool can still absorb them.

What do you need from us to quote it?

Native SolidWorks, Pro-E or UG files, or STEP. Add the volume, the duty and the delivery country and we can quote tooling and parts together.

How is the material verified?

Beside the press rather than a week away. Hardness and density catch a mis-weighed batch, Mooney viscosity catches a compound that will not flow the same way tomorrow, and ozone and ageing catch what only shows up years later.

Quote the VW Pad 02

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.