
Rubber Pad 15
Not a pad face at all but the plate under one — moulded flat, with the holes and tabs that locate it on the pedal arm formed in the tool rather than punched after.
Specification
| Part family | Moulded rubber part |
|---|---|
| Construction | Single-compound moulding, no metal insert |
| Face detail | Flat moulded plate with four mounting holes and two locating tabs. |
| Moulding compounds | EPDM, SBR, TPE, TPE-SEBS, PVC or PP, to drawing |
| Tooling | Designed and built in house |
| Prototype parts | 4 weeks from prototype tool |
| PPAP | Typically 8 weeks, to ISO/TS 16949 or VDA |
| Dimensions | Built to customer drawing or to a supplied sample |
| Moulded from | Beijing rubber plant (rubber) / Shanghai plant (plastics) |
The face on this part
Flat moulded plate with four mounting holes and two locating tabs. It sits in the Standard Rubber & Plastic Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.
Tooling and first parts
All tooling is designed and made in house. Parts from a prototype tool reach you in 4 weeks, which is the window in which the face, the retention and the hardness can still be changed without restarting anything.
Getting it approved
Where the part goes onto a programme we run PPAP to ISO/TS 16949 or VDA, typically over 8 weeks, on parts from the production tool rather than on prototypes.
What we need to quote it
The drawing or the sample, the annual volume, and the service conditions the part sees. If the part already exists in this catalogue we will tell you that instead of quoting a new tool.
Other parts in Standard Rubber & Plastic Pads

VW Pad 01
Standard Rubber & Plastic Pads
VW Pad 02
Standard Rubber & Plastic Pads
Rubber Pad 1
Standard Rubber & Plastic Pads
Rubber Pad 2
Standard Rubber & Plastic Pads
Rubber Pad 3
Standard Rubber & Plastic Pads
Rubber Pad 4
Standard Rubber & Plastic Pads
Rubber Pad 5
Standard Rubber & Plastic Pads
Rubber Pad 6
Standard Rubber & Plastic PadsBackground reading
Choosing a Pedal Pad Compound: EPDM, SBR, TPE and When Each One Fails
Service conditions, not price, should pick the compound. Here is how we narrow it down and what we test to prove the choice.
Ribs, Lattices, Studs and Slots: What Each Pedal Tread Is For
Four tread families appear across this catalogue. Each one is a different answer to the same question about grip and wear.
How to Get a Pedal Pad Quoted: Send a Drawing, or Send the Part
What we need to price a part, what we can work out ourselves, and what genuinely cannot be guessed.
Questions buyers ask
Which compound will this part be moulded in?
Whichever the drawing calls for. We run EPDM, SBR, TPE, TPE-SEBS, PVC and PP with or without glass reinforcement; if you have not fixed a compound yet, send the service conditions and we will propose one.
How long before I see a real Rubber Pad 15 sample?
Prototype parts in 4 weeks. That window is also when design changes are cheap — our designers will suggest improvements to the part while the tool can still absorb them.
What do you need from us to quote it?
Native SolidWorks, Pro-E or UG files, or STEP. Add the volume, the duty and the delivery country and we can quote tooling and parts together.
How is the material verified?
Beside the press rather than a week away. Hardness and density catch a mis-weighed batch, Mooney viscosity catches a compound that will not flow the same way tomorrow, and ozone and ageing catch what only shows up years later.
Quote the Rubber Pad 15
Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.