Skip to content
Solution

Secondary And Carton Packaging

Carton erecting, case packing, sealing, bundling, coding and secondary bagging of 10 g to 1000 g packs into woven sacks.

Secondary And Carton Packaging by Hefei Honor
Solution Process

Every Step From Design To After Sales

A line is only as good as its weakest handover. These are the stages we cover, and what we take responsibility for at each one.

1
Design and pack drawing

Two routes exist: small packs into cartons, or small packs into a woven outer bag. The route decides the whole line, so we settle it before anything else.

2
Sampling and trial

Small pack dimensional consistency drives counting reliability. We run your actual small packs through the counter before quoting the line.

3
Material selection

Carton grade and tape specification affect erector reliability more than most buyers expect. We give you the specification to hold your supplier to.

4
Production

The carton line is composed of the automatic unpacking machine, empty box conveyor, packing machine, solid box conveyor, vibrating and levelling conveyors, sealing machine, binding machine, coder and palletiser.

5
Quality inspection

Published capacity is 120 to 150 pieces a minute for 100 g to 10 kg packs, on 380 V three-phase five-wire at 15 kW with 0.5 to 0.8 MPa air.

6
Packing and logistics

On the secondary bagging route, 500 to 5000 g packs are counted and dropped into a woven bag which is then sewn closed, at 2 to 4 large bags a minute.

7
After sales

Counting sensors and the sewing head are the service items, and both are covered by the same 24/7 support arrangement.

Delivery Capability

What We Commit To

30 Days

Standard machine lead time from order confirmation.

50 Days

Custom line lead time, with production tracking available.

95%

On-time delivery rate from our own production base.

4 Hours

Guaranteed response on a critical stoppage, 24/7.

FAQ

Secondary And Carton Packaging FAQ

Questions buyers ask before they order. If yours is not here, message us and an engineer will answer.

What is included in the scope of supply?
The machine list on this page plus the transfer between the stations, the electrical interface, the installation drawings, the commissioning procedure and the spare parts list. We mark every interface on the layout so there is no gap between our scope and yours.
Can I buy part of the line now and the rest later?
Yes, and most customers do. Because the control core is shared across the range, adding the next stage later does not mean re-training operators or replacing the PLC.
Who does the installation?
You provide the civil work, the power and the compressed air to the drawings we send. Start-up is supported remotely or with our engineer on site, depending on the project size and your own maintenance capability.
What lead time should I plan for?
About 30 days for standard machines and about 50 days for a custom line, against a 95% on-time delivery record. Real-time production tracking is available during the build.
How do I start?
Send the material, the pack weight, the pack format and the output you need on WhatsApp at +86 181 1999 8478 or by email to [email protected]. A photo of your current pack and a short video of your existing line is usually enough for a first configuration.

Send Us Your Floor Plan

A dimensioned sketch of the space, the product data and the output you need is enough for us to draw the line and quote it.

Send a drawing, a bag sample photo or a video of your current line on WhatsApp or by email — that is usually enough for us to quote.