Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Handles › HONDA Handles › HONDA Handle
HONDA Handle — long moulded lever handle with a flat mounting foot
HONDA Handle — photographed at Lee World. Long moulded lever handle with a flat mounting foot.
HONDA Handles

HONDA Handle

A long lever moulding is a warpage problem before it is anything else, which is why the mounting foot is thickened and the tool is gated at the heavy end.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyMoulded rubber part
ConstructionSingle-compound moulding, no metal insert
Face detailLong moulded lever handle with a flat mounting foot.
Moulding compoundsEPDM, SBR, TPE, TPE-SEBS, PVC or PP, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Long moulded lever handle with a flat mounting foot. It sits in the HONDA Handles group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

What we need to quote it

The drawing or the sample, the annual volume, and the service conditions the part sees. If the part already exists in this catalogue we will tell you that instead of quoting a new tool.

Where it is moulded

Rubber parts are moulded at our Beijing plant in Lucheng, HuangCun Town, Daxing; plastic parts at the Shanghai plant on Huqingping Road, Qingpu District, which is also home to our R&D centre.

One compound, one tool, one shot

The tread, the retaining geometry and any mounting holes or locating tabs are all formed in the tool rather than added afterwards. That is why the tool drawing and the part drawing are effectively the same document, and why a change to the face means a change to the tool.

Questions buyers ask

Which compound will this part be moulded in?

Whichever the drawing calls for. We run EPDM, SBR, TPE, TPE-SEBS, PVC and PP with or without glass reinforcement; if you have not fixed a compound yet, send the service conditions and we will propose one.

How long before I see a real HONDA Handle sample?

Four weeks from a prototype tool. The tool shop is in the same buildings as the moulding lines in Shanghai and Beijing, so prototype work does not queue behind a subcontractor.

What do you need from us to quote it?

A drawing or sample plus the annual volume. Say at that point whether PPAP is required and to which standard — ISO/TS 16949 or VDA — so it is planned in rather than added later.

How is the material verified?

In our Beijing facility, next to the production line: Shore A hardness, density, ozone, ageing, tensile strength, elongation to fracture, vulcanization and insulation resistivity, oil resistance and Mooney viscosity.

Quote the HONDA Handle

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.