Solution
Packaging And Logistics
Packaging decides two numbers that quietly determine profit: how many units fit in a container, and how many arrive undamaged. Both are engineering problems, and both are solved before the first order rather than after the first claim.
Process
Every Stage And What It Takes
- 1
Carton engineering
5 to 7 daysProduct size, protection and container loading calculated together so nothing is oversized by habit.
- 2
Drop testing
3 to 5 daysCartons tested at 80 cm on six faces in the configuration they will actually ship in.
- 3
Retail or e-commerce design
7 to 14 daysShelf-facing retail boxes or plain protective cartons for marketplace fulfilment, designed to different rules.
- 4
Marking and labelling
Within productionBarcodes, FNSKU, country of origin and market-specific labels applied at the factory.
- 5
Loading and booking
3 to 5 daysPallet configuration, container loading plan and booking with your nominated forwarder.
Scope
What Is Included
- Carton dimension and container loading calculation
- Drop testing in the actual shipping configuration
- Retail box design for shelf display
- E-commerce packaging for courier networks
- FNSKU, barcode and origin labelling
- FOB Shenzhen or delivered terms including Amazon FBA
What Sits Outside This Service
- Customs clearance in the destination country
- Import duty and local compliance filing
If your project falls outside this scope, say so early. We would rather tell you at the enquiry stage than three months into a development programme.
Answers
Packaging And Logistics Questions
What does this service cost
Service cost is built into the unit price rather than charged separately, except for tooling on ODM projects and certification testing fees, which are quoted as line items before work starts.
Who owns the design
On OEM work the housing design stays with us and your branding stays with you. On ODM projects where you fund the tooling, the design of that housing is yours under the terms in the development agreement.
Do you sign an NDA
Yes, before any files, drawings or commercial detail move in either direction.
What happens if a sample is not approved
We revise and rebuild. Production does not start until you sign off a pre-production sample, and there is no limit on reasonable revision rounds during that stage.
Next Step
Start A Packaging And Logistics Project
Send your concept, target market and volume expectation. We will tell you what is realistic on cost and timing before you commit anything.
Replies within 24 hours on working days. No enquiry forms, we answer on WhatsApp and email directly.