Skip to content

Smart pet feeders and water fountains manufactured in Shenzhen since 2012

Solution

Packaging And Logistics

Packaging decides two numbers that quietly determine profit: how many units fit in a container, and how many arrive undamaged. Both are engineering problems, and both are solved before the first order rather than after the first claim.

80cmDrop test height
6facesTest coverage
40HQLoading planned
FBAPrep available

Process

Every Stage And What It Takes

  1. 1

    Carton engineering

    5 to 7 days

    Product size, protection and container loading calculated together so nothing is oversized by habit.

  2. 2

    Drop testing

    3 to 5 days

    Cartons tested at 80 cm on six faces in the configuration they will actually ship in.

  3. 3

    Retail or e-commerce design

    7 to 14 days

    Shelf-facing retail boxes or plain protective cartons for marketplace fulfilment, designed to different rules.

  4. 4

    Marking and labelling

    Within production

    Barcodes, FNSKU, country of origin and market-specific labels applied at the factory.

  5. 5

    Loading and booking

    3 to 5 days

    Pallet configuration, container loading plan and booking with your nominated forwarder.

Scope

What Is Included

  • Carton dimension and container loading calculation
  • Drop testing in the actual shipping configuration
  • Retail box design for shelf display
  • E-commerce packaging for courier networks
  • FNSKU, barcode and origin labelling
  • FOB Shenzhen or delivered terms including Amazon FBA

What Sits Outside This Service

  • Customs clearance in the destination country
  • Import duty and local compliance filing

If your project falls outside this scope, say so early. We would rather tell you at the enquiry stage than three months into a development programme.

Answers

Packaging And Logistics Questions

What does this service cost

Service cost is built into the unit price rather than charged separately, except for tooling on ODM projects and certification testing fees, which are quoted as line items before work starts.

Who owns the design

On OEM work the housing design stays with us and your branding stays with you. On ODM projects where you fund the tooling, the design of that housing is yours under the terms in the development agreement.

Do you sign an NDA

Yes, before any files, drawings or commercial detail move in either direction.

What happens if a sample is not approved

We revise and rebuild. Production does not start until you sign off a pre-production sample, and there is no limit on reasonable revision rounds during that stage.

Next Step

Start A Packaging And Logistics Project

Send your concept, target market and volume expectation. We will tell you what is realistic on cost and timing before you commit anything.

Replies within 24 hours on working days. No enquiry forms, we answer on WhatsApp and email directly.