Skip to content

Smart pet feeders and water fountains manufactured in Shenzhen since 2012

Trust Centre

Every Stage Of Manufacturing Under One Roof

Tooling, moulding, electronics, assembly, testing and packing all happen in the same Shenzhen building. This page shows what that means in practice, because factory claims are easy to make and harder to document.

24hrsAgeing per unit
100%Function tested
80cmDrop test height
2yrsRecord retention

Production Areas

What Sits In The Building

Six areas, each with a specific job. Every image below is from our own production floor, with a note on why that stage matters to the product you would receive.

Assembly Lines at the PAWBILT factory in Shenzhen

Assembly Lines

Twelve-station lines with function checks built into the sequence. An operator finds a fault at the station where it was created rather than at final inspection.

Quality Control at the PAWBILT factory in Shenzhen

Quality Control

Units move from assembly straight into testing. Every unit runs for 24 hours and passes a 100 percent function test before it is allowed near a carton.

Mould Workshop at the PAWBILT factory in Shenzhen

Mould Workshop

Tooling for every housing in the range is cut and maintained here. Keeping the mould shop in the building means an ODM revision is scheduled by us rather than queued behind another factory's work.

Injection Moulding at the PAWBILT factory in Shenzhen

Injection Moulding

Housings, hoppers, chutes and bowls moulded from food-grade ABS and PP. Material certificates name the grade and the supplier rather than making a general claim.

Warehouse And Packing at the PAWBILT factory in Shenzhen

Warehouse And Packing

Cartons engineered for container loading and tested in the configuration they will actually ship in, whether that is a pallet to a distribution centre or a courier network.

Finished Goods at the PAWBILT factory in Shenzhen

Finished Goods

What leaves the building. Every unit is function tested, aged for 24 hours and packed in a carton that has passed a drop test at 80 cm on six faces.

Quality Control

Six Checkpoints Before A Unit Ships

  1. 1

    Incoming material

    Every batch of food-grade resin and every electronic component checked against its specification before it enters the store.

  2. 2

    In-process checks

    Function checks built into the assembly sequence so a fault is found at the station that created it.

  3. 3

    Ageing run

    24 hours of continuous operation on every unit before it is packed.

  4. 4

    Function test

    100 percent of units tested for dispensing, connectivity, camera where fitted and battery backup.

  5. 5

    Drop test

    80 cm on six faces in the export carton, on a sample from every batch.

  6. 6

    Pre-shipment inspection

    AQL sampling on the finished, packed goods, with the report shared before the container is sealed.

Certification

Documentation We Hold

CE

European Union conformity including the Radio Equipment Directive

FCC

United States radio frequency emissions

RoHS

Restriction of hazardous substances in materials

ISO

Quality management system covering the facility

Food-grade

Material certificates for all food contact components

On request

UKCA, PSE, KC and other destination market files

Test reports name the factory rather than a trading company. Ask on WhatsApp for the specific report covering the model you are evaluating.

Factory Tours

Come And See It

We arrange factory visits for buyers evaluating a programme. If travel is not practical, we record a video walkthrough of the specific lines that would build your product, including the assembly stations and the ageing room.

Answers

Quality And Audit Questions

Can we audit the factory

Yes. We accept third-party audits and customer audits, and we prepare the documentation pack in advance so the visit is spent on the floor rather than searching for records.

What records do you retain

Batch records, test results, material certificates and inspection reports for two years, which is what a traceability request needs if a field issue appears months after shipment.

Do you allow pre-shipment inspection

Yes, by your own team or a third-party agency. We schedule the inspection before the container is booked so any finding can be corrected rather than shipped.

Is the ageing test really run on every unit

Yes, 24 hours on every unit. It is the single most effective step for catching the early-life electrical failures that generate returns in the first month.

Next Step

Ask For The Documentation

Test reports, material certificates and inspection records for any model in the range. Tell us which model and the file comes back the same day.

Replies within 24 hours on working days. No enquiry forms, we answer on WhatsApp and email directly.