Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Sport Pads › Ford Sport Pads › Ford CD4 ETC Pad
Ford CD4 ETC Pad — tall, slim black-and-stainless face for an electronic throttle pedal
Ford CD4 ETC Pad — photographed at Lee World. Tall, slim black-and-stainless face for an electronic throttle pedal.
Ford Sport Pads

Ford CD4 ETC Pad

ETC means electronic throttle control: a drive-by-wire accelerator with a hanging pedal, which is why this face is the tallest and slimmest of the CD4 group.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyOvermoulded finisher plate
ConstructionMetal face with moulded rubber inserts
Face detailTall, slim black-and-stainless face for an electronic throttle pedal.
Face finish optionsBrushed aluminium, sand blasted stainless steel or polished stainless steel
Face markingLaser etching available on steel components
Insert compoundsEPDM, SBR, TPE or TPE-SEBS, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Tall, slim black-and-stainless face for an electronic throttle pedal. It sits in the Ford Sport Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

What we need to quote it

A drawing in SolidWorks, Pro-E or UG — a STEP export is fine — or the physical sample, which we will measure and model for your approval. Annual volume and the required PPAP standard complete the picture.

Where it is made and tested

The stainless work and assembly run through our Shanghai and Beijing sites; the rubber insert is moulded in Beijing, where the test equipment sits next to the production line. Hardness, ozone, ageing and oil resistance are all checked there.

How a finisher plate is built

The plate is cut from sheet — laser cut if the material is thin, CNC machined if it is thicker — then finished and married to a moulded rubber insert. On an overmoulded part the plate goes into the rubber tool and the compound is moulded onto and through it, so the two leave as one piece. On a press fit part the insert is moulded separately and pressed home.

Questions buyers ask

Can the metal face be changed without retooling the rubber?

Yes. The stainless or aluminium blank and the rubber insert are separate tools, so a change of finish — brushed, sand blasted or polished — does not touch the rubber tool. A change to the insert pattern does.

How long before I see a real Ford CD4 ETC Pad sample?

All tooling is designed and made in house, and we deliver parts from a prototype tool in 4 weeks. Full PPAP to ISO/TS 16949 or VDA typically takes a further 8 weeks.

What do you need from us to quote it?

Send the sample if you have no drawing. We will measure it, model it and come back with a drawing for your approval before anything is cut.

How is the material verified?

Our production facilities in Beijing, Shanghai and Wuhan are ISO/TS certified, and the rubber test equipment sits next to the Beijing production line so a bad batch is stopped, not diagnosed later.

Quote the Ford CD4 ETC Pad

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.