Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Sport Pads › Ford Sport Pads › Mondeo Sport Pad 8
Mondeo Sport Pad 8 — broad stainless face with three long moulded rubber bars
Mondeo Sport Pad 8 — photographed at Lee World. Broad stainless face with three long moulded rubber bars.
Ford Sport Pads

Mondeo Sport Pad 8

A later Mondeo variant that swaps the stud pattern for three long bars — a cheaper insert to tool, and a pattern that suits a pedal the foot always meets square on.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyOvermoulded finisher plate
ConstructionMetal face with moulded rubber inserts
Face detailBroad stainless face with three long moulded rubber bars.
Face finish optionsBrushed aluminium, sand blasted stainless steel or polished stainless steel
Face markingLaser etching available on steel components
Insert compoundsEPDM, SBR, TPE or TPE-SEBS, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Broad stainless face with three long moulded rubber bars. It sits in the Ford Sport Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

Tooling, and who owns the timing

All tooling is designed and made in house, in the same buildings as the moulding lines in Shanghai and Beijing. That is why parts from a prototype tool take 4 weeks rather than the eight to ten a subcontracted tool would need.

Moving from sample to approved part

Prototype parts prove the shape. PPAP proves the process — that a production tool on a production line makes parts that match the drawing repeatably. We run PPAP to ISO/TS 16949 or VDA, typically over 8 weeks.

What we need to quote it

A drawing in SolidWorks, Pro-E or UG — a STEP export is fine — or the physical sample, which we will measure and model for your approval. Annual volume and the required PPAP standard complete the picture.

Questions buyers ask

Can the metal face be changed without retooling the rubber?

Yes. The stainless or aluminium blank and the rubber insert are separate tools, so a change of finish — brushed, sand blasted or polished — does not touch the rubber tool. A change to the insert pattern does.

How long before I see a real Mondeo Sport Pad 8 sample?

Four weeks from a prototype tool. The tool shop is in the same buildings as the moulding lines in Shanghai and Beijing, so prototype work does not queue behind a subcontractor.

What do you need from us to quote it?

A drawing or sample plus the annual volume. Say at that point whether PPAP is required and to which standard — ISO/TS 16949 or VDA — so it is planned in rather than added later.

How is the material verified?

In our Beijing facility, next to the production line: Shore A hardness, density, ozone, ageing, tensile strength, elongation to fracture, vulcanization and insulation resistivity, oil resistance and Mooney viscosity.

Quote the Mondeo Sport Pad 8

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.