Pedal pads and moulded rubber since 1998Shanghai · Beijing · Czech Republic · New York
+86 186 0217 6258[email protected]
Request A Quote
All 64 parts Sport PadsRubber & Plastic PadsHandlesRubber & Plastic Products Technology and process Engineering and PPAP Testing and quality Knowledge centre About Lee World Contact
Home › Sport Pads › Ford Sport Pads › Ford Edge Sport Pad 7
Ford Edge Sport Pad 7 — stainless face with four elongated rubber slots
Ford Edge Sport Pad 7 — photographed at Lee World. Stainless face with four elongated rubber slots.
Ford Sport Pads

Ford Edge Sport Pad 7

Four long slots rather than studs — the pattern that gives the most rubber contact area per unit of tooling on the Edge pedal face.

Dimensions are built to your drawing or to a supplied sample. Compound and Shore A hardness are confirmed on the drawing before any tool is cut.

Specification

Part familyOvermoulded finisher plate
ConstructionMetal face with moulded rubber inserts
Face detailStainless face with four elongated rubber slots.
Face finish optionsBrushed aluminium, sand blasted stainless steel or polished stainless steel
Face markingLaser etching available on steel components
Insert compoundsEPDM, SBR, TPE or TPE-SEBS, to drawing
ToolingDesigned and built in house
Prototype parts4 weeks from prototype tool
PPAPTypically 8 weeks, to ISO/TS 16949 or VDA
DimensionsBuilt to customer drawing or to a supplied sample
Moulded fromBeijing rubber plant (rubber) / Shanghai plant (plastics)

The face on this part

Stainless face with four elongated rubber slots. It sits in the Ford Sport Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.

What we need to quote it

A drawing in SolidWorks, Pro-E or UG — a STEP export is fine — or the physical sample, which we will measure and model for your approval. Annual volume and the required PPAP standard complete the picture.

Where it is made and tested

The stainless work and assembly run through our Shanghai and Beijing sites; the rubber insert is moulded in Beijing, where the test equipment sits next to the production line. Hardness, ozone, ageing and oil resistance are all checked there.

How a finisher plate is built

The plate is cut from sheet — laser cut if the material is thin, CNC machined if it is thicker — then finished and married to a moulded rubber insert. On an overmoulded part the plate goes into the rubber tool and the compound is moulded onto and through it, so the two leave as one piece. On a press fit part the insert is moulded separately and pressed home.

Questions buyers ask

Can I have this face in aluminium instead of stainless?

Yes — brushed aluminium is one of the three finishes buyers most often ask for, alongside sand blasted and polished stainless. The blank changes; the rubber tool does not.

How long before I see a real Ford Edge Sport Pad 7 sample?

Four weeks from a prototype tool. The tool shop is in the same buildings as the moulding lines in Shanghai and Beijing, so prototype work does not queue behind a subcontractor.

What do you need from us to quote it?

A drawing or sample plus the annual volume. Say at that point whether PPAP is required and to which standard — ISO/TS 16949 or VDA — so it is planned in rather than added later.

How is the material verified?

In our Beijing facility, next to the production line: Shore A hardness, density, ozone, ageing, tensile strength, elongation to fracture, vulcanization and insulation resistivity, oil resistance and Mooney viscosity.

Quote the Ford Edge Sport Pad 7

Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.