Turn-Key Extraction Plant

From process parameters and engineering design through manufacturing, installation and operator training.

Better Industry has moved from being a machinery manufacturer to being a comprehensive proposal provider for plant extraction and production. A turn-key project covers the specific extraction process parameters, the engineering design, the equipment manufacturing and the installation.

Better Industry plant extraction factory seen from the air

From Requirement To Delivery

Each stage in the order it happens, so you can see where your decisions are needed and where ours are.

1 Requirement analysis Two things start every quotation: the raw material you will process, and the production capacity you need per batch. Everything else is engineered around those two answers.
2 Extraction trial An extraction test can be run with your raw material. Videos and pictures of the trial are sent to you for reference before anything is built.
3 Process parameters The trial defines the specific extraction process parameters: pressure, temperature, solvent ratio, cycle time and the separation stages.
4 Engineering design The line is laid out around those parameters, the batch size and the space available in your building.
5 Manufacturing Equipment is manufactured in the plant extraction factory. Every procedure and detail is inspected, which is why a supercritical CO2 machine takes around 60 workdays.
6 Assembly and testing The machine is assembled and tested before packing, so it has already been run before it is crated.
7 Packing and shipping Machines are packed in plywood cases for export.
8 Installation and training Installation support and engineer training are provided on site, and online video guidance is available for smaller issues afterwards.

FAQ

Questions About This Solution

What is included in a turn-key solution?
Specific extraction process parameters, engineering design, equipment manufacturing and installation.
How long does manufacturing take?
For a supercritical CO2 extraction machine the process flow is complex and production generally takes about 60 workdays.
How is the equipment packed and installed?
In plywood cases. The machine is assembled and tested before packing, and installation service is provided.
Can you help after the machine is running?
Yes. Engineers provide online video guidance for smaller issues so problems are solved without waiting for a site visit.

Next Step

Start With Your Material And Your Capacity

Those two answers are enough to begin. Everything else is engineered from there.

Send two things and a real specification comes back: the raw material you will process, and the production capacity you need per batch.