
Ford CD4 Brake Manual Pad
CD4 is a Ford vehicle platform rather than a single model, so this pad is tooled once and carried across every manual-transmission car built on it.
Specification
| Part family | Overmoulded finisher plate |
|---|---|
| Construction | Metal face with moulded rubber inserts |
| Face detail | Curved black-and-stainless face, narrow manual-pedal width. |
| Face finish options | Brushed aluminium, sand blasted stainless steel or polished stainless steel |
| Face marking | Laser etching available on steel components |
| Insert compounds | EPDM, SBR, TPE or TPE-SEBS, to drawing |
| Tooling | Designed and built in house |
| Prototype parts | 4 weeks from prototype tool |
| PPAP | Typically 8 weeks, to ISO/TS 16949 or VDA |
| Dimensions | Built to customer drawing or to a supplied sample |
| Moulded from | Beijing rubber plant (rubber) / Shanghai plant (plastics) |
The face on this part
Curved black-and-stainless face, narrow manual-pedal width. It sits in the Ford Sport Pads group, and the photograph above is of the part itself rather than a rendering — what you see is the tread, the outline and the finish as they leave the tool.
Putting a logo on it
Many of our customers require an aesthetic logo to be present on their parts. On steel components we laser etch it, after finishing rather than before, so the mark sits in the finished surface instead of under it.
Why the insert compound is a separate decision
The plate decides how the part looks; the insert decides how it behaves. EPDM for weather and ozone, SBR where cost governs, TPE or TPE-SEBS where a softer touch is wanted. Shore A hardness belongs on the drawing next to the dimensions.
Tooling, and who owns the timing
All tooling is designed and made in house, in the same buildings as the moulding lines in Shanghai and Beijing. That is why parts from a prototype tool take 4 weeks rather than the eight to ten a subcontracted tool would need.
Other parts in Ford Sport Pads
Background reading
Sport Pad or Rubber Pad? The Difference That Decides Your Tooling Cost
A sport pad has a metal face; a rubber pad does not. That single difference drives tooling count, unit price and how the part is validated.
Overmoulding vs Press Fit: Two Ways to Get Rubber Onto a Finisher Plate
Both produce a metal-faced pedal pad. They differ in tooling, in retention and in how easily the part can be pulled apart.
Brushed, Sand Blasted or Polished: Picking a Pedal Face Finish
The three finishes buyers actually ask for, what each one hides, and why a finish change is not a tooling change.
Questions buyers ask
Is the rubber overmoulded or pressed in?
We produce both. Overmoulding gives one inseparable part and suits small or pryable inserts; press fit lowers tooling and suits large inserts that their own geometry already retains. Which one applies is set on the drawing before the tool is cut.
How long before I see a real Ford CD4 Brake Manual Pad sample?
Our prototype shop exists for exactly this. Parts from a prototype tool take 4 weeks; PPAP to ISO/TS 16949 or VDA, on production parts, is typically 8 weeks after that.
What do you need from us to quote it?
A drawing, or a physical sample we can measure. Our designers work in SolidWorks, Pro-E and UG, so a native or STEP file is enough to start.
How is the material verified?
Through the nine test methods we run in Beijing, and through CTI — Centre Testing International Corporation, Shanghai — where an accredited third-party result is required.
Quote the Ford CD4 Brake Manual Pad
Send the annual volume and, if you have one, the drawing. Prototype parts follow 4 weeks after a prototype tool.







