
Lead Times Shipping and Support for Overseas Buyers
What happens between your purchase order and the unit arriving at your plant, with the real lead times and the real port.
Ordering and Delivery
Enquiry
Send the model number, or the eight custom inputs, by email to [email protected] or by WhatsApp.
Quotation
You receive pricing against the specification, with the drawing where the unit is customised.
Lead time
Standard products 7–15 days. Simple customised products 10–20 days. Complex customised products 15–40 days.
Inspection
Electrical and functional testing before packing.
Shipping
Small orders normally go by air and large orders by sea, negotiated before despatch.
Port
Delivery port is Jiujiang, China Mainland.
After sale
12 month warranty from date of sale, plus technical support and training material.
Models Referenced Here
Representative models across the main families.
DHS045-95 DHS045-95 Ingiant OD 45mm rotor flange slip ring transmits 81…
Waterproof Slip Ring Ø78mm OD IP65/IP68 – Custom Sealed Rotary Joint for…
Ingiant DHS078 Solid Shaft Ethernet Slip Ring 78mm OD Gigabit Data & Power…
DHS055-11-2F Ingiant Photoelectric Slip Ring OD 55mm with 2 channels optical…
DHS066-39-1F Ingiant Optoelectronic slip ring OD 66mm with 1 single mode…
Background Reading
Deepening Global Rotary Connection Market Layout | Jiujiang Ingiant Technology Concludes 2026 Moscow International Packaging & Printing Exhibition, Upcoming Attendance at Top South African Mining Equipment Expo
1. Review of Moscow Packaging & Printing Exhibition From June 16 to 19, 2026, the international packaging and printing industry…
Primary Applications of Slip Rings in Karting
Primary Applications of Slip Rings in Karting The fundamental role of a slip ring is to transmit signals, data, and power…
“Ascend Celestial Peak · Unite Hearts and Minds · Forge Top Talents” — 2025 Jiujiang Ingiant Technology Autumn Outing Chronicles
“Ascend Celestial Peak · Unite Hearts and Minds · Forge Top Talents” — 2025 Jiujiang Ingiant Technology Autumn Outing Chronicles…
Ordering and Delivery Questions
What is your delivery port?
The delivery port is Jiujiang, China Mainland.
How do you ship goods?
Small orders are usually delivered by air and large orders by sea. It can be negotiated before delivery.
How long is production lead time?
7 to 15 days for standard products, 10 to 20 days for simple customised products and 15 to 40 days for complex customised products.
Start With Your Requirement Not a Model Number
Rotating speed, installation size, circuit count, voltage and current per ring, signal types, operating temperature and IP grade — send those eight and you get a design back.








