Shaanxi Jiade Group Co Ltd · Xi'an, Shaanxi, China
[email protected] +86 29 8959 9018 Mon to Sat 08:30 to 18:00 GMT+8
Certification documents displayed by the works quality department
Solution

Inspection and Certification

Material that cannot be documented cannot be installed. The works holds pressure equipment and classification approvals, and third party inspection is arranged against the body your project names, before the container leaves…

Why This Sequence Exists

Material that cannot be documented cannot be installed. The works holds pressure equipment and classification approvals, and third party inspection is arranged against the body your project names, before the container leaves Shanghai.

  1. Name the Certificate Level

    A certificate discovered to be the wrong type at site delays acceptance for weeks. The level is fixed at order stage, from a mill test certificate through an EN 10204 3.1 certificate to full third party inspection.

  2. Select the Inspection Body

    Different projects accept different agencies, and an unnamed inspector is no inspector. Material is approved by third party inspection agencies including DNV, BV, SGS, TUV, ABS, LR, GL, RINA, KR, NKK, AIB-VINCOTTE, CEIL, VELOSO and CCSI. Name yours on the order.

  3. Apply the Works Approvals

    European and marine projects require approvals that a general supplier does not hold. The works carries PED 2014/68/EU pressure equipment certification, AD 2000 W0 German TUV certification, China Classification Society CCS certification, the China special equipment manufacturing licence at TS grades A1 A2 and B, and quality environment and occupational health system certification.

  4. Verify Chemistry and Mechanicals

    A certificate without test data behind it is a formality rather than a control. Chemistry is checked against the ordered specification and mechanical properties such as tensile and yield strength are confirmed by test, with the results recorded against the heat.

  5. Check Dimensions and Defects

    Wall thickness at the pipe end is often uneven after rolling, and a collapsed end is not visible from outside. Pipe ends are checked and cropped where necessary, using camera and image processing to identify collapsed pipe wall before a laser wall thickness gauge is passed into the bore.

  6. Release Against the File

    Documents that arrive after the goods hold the goods at the port. The certificate file is completed before release and travels with the shipment, so customs and the site inspector are working from the same paperwork.

FAQ

Inspection and Certification Questions

Which certificates can you issue
A mill test certificate with every heat, EN 10204 3.1 certificates on the fittings programme, and MTC, CE, ISO and PED documents on the 316L bar programme.
Which third party inspection bodies do you work with
DNV, BV, SGS, TUV, ABS, LR, GL, PED, RINA, KR, NKK, AIB-VINCOTTE, CEIL, VELOSO and CCSI, among others.
What quality approvals does the works hold
The China special equipment manufacturing licence at TS grades A1, A2 and B, AD 2000 W0 German TUV certification, PED 2014/68/EU European pressure equipment certification, China Classification Society CCS certification, and quality, environment and occupational health system certification.
Do the fittings carry API approval
The elbow programme carries ISO 9001, API and SGS, and the tee programme carries ISO 9001:2015, API Q1 and a 3.1 certificate.
Can inspection be witnessed before shipment
Yes. Name the inspection body and the hold points on your order and the inspection is arranged before release.

Inspection and Certification

Send the detail and the answer comes back with the quotation rather than after it.