Inspection and Certification
Material that cannot be documented cannot be installed. The works holds pressure equipment and classification approvals, and third party inspection is arranged against the body your project names, before the container leaves…
Why This Sequence Exists
Material that cannot be documented cannot be installed. The works holds pressure equipment and classification approvals, and third party inspection is arranged against the body your project names, before the container leaves Shanghai.
Name the Certificate Level
A certificate discovered to be the wrong type at site delays acceptance for weeks. The level is fixed at order stage, from a mill test certificate through an EN 10204 3.1 certificate to full third party inspection.
Select the Inspection Body
Different projects accept different agencies, and an unnamed inspector is no inspector. Material is approved by third party inspection agencies including DNV, BV, SGS, TUV, ABS, LR, GL, RINA, KR, NKK, AIB-VINCOTTE, CEIL, VELOSO and CCSI. Name yours on the order.
Apply the Works Approvals
European and marine projects require approvals that a general supplier does not hold. The works carries PED 2014/68/EU pressure equipment certification, AD 2000 W0 German TUV certification, China Classification Society CCS certification, the China special equipment manufacturing licence at TS grades A1 A2 and B, and quality environment and occupational health system certification.
Verify Chemistry and Mechanicals
A certificate without test data behind it is a formality rather than a control. Chemistry is checked against the ordered specification and mechanical properties such as tensile and yield strength are confirmed by test, with the results recorded against the heat.
Check Dimensions and Defects
Wall thickness at the pipe end is often uneven after rolling, and a collapsed end is not visible from outside. Pipe ends are checked and cropped where necessary, using camera and image processing to identify collapsed pipe wall before a laser wall thickness gauge is passed into the bore.
Release Against the File
Documents that arrive after the goods hold the goods at the port. The certificate file is completed before release and travels with the shipment, so customs and the site inspector are working from the same paperwork.
Products This Applies To

Stainless Steel Equal and Reducing Tee
A stainless steel tee is a T shaped fitting with three branches, used to divide or combine pipelines, adjust flow rate and change…
View specifications →
Stainless Steel Elbow 45 90 and 180 Degree
A stainless steel elbow changes direction in a piping system. The standard set is 45, 90 and 180 degree in long radius, plus 90 and…
View specifications →
316L Stainless Steel Bar
316L is widely used in the chemical industry for its corrosion resistance. It is a derivative of 18-8 austenitic stainless steel…
View specifications →
904L Stainless Steel Bar
904L bar is a low carbon, high nickel and molybdenum super austenitic stainless steel with strong activation and passivation…
View specifications →
Nickel 200 Seamless Pipe
Nickel 200 seamless pipe is commercially pure wrought nickel supplied to ASTM B161 under UNS N02200. It is the standard choice for…
View specifications →
Nickel Alloy 625 Exhaust Tubing
Nickel alloy 625 exhaust tubing is cold worked seamless tube covered by ASTM B444 under UNS N06625, also carried as BS 3074 NA21…
View specifications →Inspection and Certification Questions
Which certificates can you issue
Which third party inspection bodies do you work with
What quality approvals does the works hold
Do the fittings carry API approval
Can inspection be witnessed before shipment
Inspection and Certification
Send the detail and the answer comes back with the quotation rather than after it.