Heel guard, concrete cover, ditch, welded and press locked steel grating, made in Yantai since 2010 Mon-Fri 08:30-17:30 GMT+8 [email protected] +86 138-5358-4341
  1. Home
  2. Products
  3. Drainage And Water Management
A long run of ditch steel grating covering a drainage channel across a concrete yard
Who We Supply

Drainage And Water Management

Channel systems, gullies and chambers where the steel top has to suit an opening that was cast rather than machined.

Where It Goes Wrong

  • Panels ordered to a nominal opening that do not fit the opening as built
  • Covers rocking in the frame and banging under every wheel
  • Rust starting at every panel joint along an outdoor run
  • Grating routed around a walking line because no heel-safe option was specified
  • Channels blocked by grit packed into a mesh that was too tight

What These Buyers Ask For

  • Panels made from measured dimensions, not from the drawing that was issued
  • Hold-downs and clips where vehicles brake and turn
  • Hot-dip galvanizing applied after cutting and banding
  • Heel guard pitch where a run crosses a pedestrian route
  • Junction, corner and gully panels made with the run

Typical Scenarios

  • Yard and access road drainage runs
  • Car park and ramp channels
  • Kerbside gullies and sumps in municipal works
  • Building perimeter drainage crossing footpaths

How We Supply

  • Panels drawn from the channel as measured on site
  • Runs galvanized as one batch so panels interchange between bays
  • Panels marked to their bay when a layout is supplied
  • Frames, end plates and hold-downs fabricated with the run
Questions

Drainage And Water Management Questions

Can you work from photographs of an existing channel?
Yes, with a tape measure in shot and the internal width, depth and frame detail written down.
What load class can you certify?
The source specification publishes no load class table, so the class is confirmed in writing against your loading rather than claimed from a catalogue.
Do you supply gully and junction panels?
Yes, in the same structure and finish so a run looks continuous.
How long are lead times?
Not published. They are confirmed in writing against the drawing and the quantity.

Talk Through A Project

Send the openings, the traffic crossing them and the environment. A shortlist with bar sections comes back by email.