How To Size A Drainage Channel Cover
The five measurements and two facts that turn an enquiry into a panel that drops in first time.
Measure The Opening As Built
Not as drawn. Concrete moves, frames get knocked during the pour, and a channel that was specified at 300 mm is frequently not 300 mm along its whole length. Measure at several points and send the smallest.
Send The Frame Detail
Whether the panel sits on a cast-in angle, on a rebate, or directly on the concrete changes the panel size, the banding and the clearance. A photograph of the frame answers this faster than a description.
Say What Crosses It
Pedestrians, hand trolleys, forklifts with an axle load, or road vehicles. This decides the bearing bar depth and it is the single most common omission in an enquiry.
Decide The Panel Length By The Lift
Channel covers get lifted for cleaning. If they are too heavy for the people who have to lift them, they stop being lifted and the channel stops being cleaned. Say who lifts them and how often.
Name The Environment
Rain and grit, or washdown chemicals and chlorides. That decides galvanized carbon steel against stainless steel with passivation, and it decides it before price does.
Products Referenced In This Guide

Ditch Steel Grating 32x5 Carbon Steel
Hot-dip galvanized ditch grating on 32x5 bearing bar with a 6 mm round cross bar, for yard and roadway channels crossed by vehicles.
See the specification
Concrete Cover Grating 30x2.5 Hook Type
Light-duty hook cover panel on 30x2.5 bearing bar with 8x2 cross bar, hot-dip galvanized, for chambers crossed by pedestrians and hand trolleys.
See the specification
Ditch Steel Grating 30x5 Stainless Steel
Stainless steel ditch grating on 30x5 bearing bar with an 8 mm round cross bar, acid passivated, for interior floor channels that are washed down.
See the specification
Concrete Cover Grating 65x5 Heavy Duty
Heavy cover panel on 65x5 bearing bar with a 6 mm round cross bar, hot-dip galvanized, for chambers crossed by forklifts and light vehicles.
See the specificationProduct Families Covered
Questions About This Guide
What if I cannot measure the channel yet?
Do you allow clearance for the coating?