Heel guard, concrete cover, ditch, welded and press locked steel grating, made in Yantai since 2010 Mon-Fri 08:30-17:30 GMT+8 [email protected] +86 138-5358-4341
  1. Home
  2. Products
  3. Export Packing And Delivery
Concrete cover grating panels with welded hooks stacked at the ShengJingYe plant
Programme

Export Packing And Delivery

Grating is heavy, sharp and easy to damage, and most of this plant’s output travels by sea.

The export company was established in 2023 to serve foreign markets, and packing is where that shows. A panel that was perfect when it was inspected can arrive bent at the corner, rubbed through the coating where banding cut in, or unidentifiable because nothing was marked. None of those are manufacturing faults, and all of them are avoidable.

Stage By Stage

Export Packing And Delivery In 6 Steps

Inspection Before Packing

Nothing is fixed once it is in a container.

Size, squareness, bar pitch and coating finish are checked against the drawing before anything is banded.

Marking

Unmarked panels get sorted twice: once by you, once again by the installer.

Where a layout drawing is supplied, panels are marked to their position so they go straight to the right opening on site.

Stacking

Grating damages grating when it is stacked carelessly.

Panels are stacked flat and square with bearing bars aligned, which is what stops edges biting into the panel below.

Banding And Protection

Banding under tension cuts through a fresh zinc coat.

Stacks are banded with protection at the contact points so the coating is not the thing holding the bundle together.

Loading

Weight distribution in a container is a safety issue, not a preference.

Heavy stacks are loaded and secured for sea freight, which is the route most of this output takes.

Documentation

The paperwork decides whether the steel clears or sits.

Shipping documents are prepared per order and destination. Which compliance documents a shipment needs depends on the country, so they are confirmed per order rather than published here.

Questions

Export Packing And Delivery Questions

Which incoterms do you work on?
Not published by the source specification, so terms are agreed per order.
How are panels protected from banding damage?
With protection at the contact points, because banding tension is what usually cuts into a fresh coating.
Will panels be marked for their position?
Yes, when a layout drawing is supplied with the order.
What certifications ship with the goods?
The source specification publishes no certification marks, so this is marked TBC and confirmed per order and destination.

Start On Export Packing And Delivery

Send the reference, the quantity and the destination market. A recommended starting point with the matching specifications comes back by email.