Getting the evidence into the shipping documents instead of into an argument later.
Where Orders Usually Break and What Is Done About It
Each stage names the problem first, because that is what the step exists to prevent, and then what actually happens.
Order Confirmation
Inspection requirements raised after production are expensive or impossible.
In-Process Control
Defects found at the end of production are already sunk cost.
Pre-Loading Inspection
Container doors closing is the last moment anything can be corrected.
Third-Party Inspection
Buyers reasonably want evidence that is not written by the seller.
Documentation
Goods arriving ahead of their paperwork sit at the port.
Categories This Applies To

PVQ Steel Plate
Pressure vessel quality plate for boilers, tanks and pressure equipment.
Explore Range
Shipbuilding Steel Plate
Classification-grade hull and structural plate for shipyards and offshore fabricators.
Explore Range
Boiler Steel Pipe
Boiler and superheater tubing for water wall, economiser and heat exchanger duty.
Explore Range
Ecological Board
Low-emission faced panels for furniture programmes with an environmental specification.
Explore RangeRepresentative Products

ASTM A387 Gr.11 Steel Plate
ASTM A387 Gr.11 Steel Plate is supplied at 8mm-150mm or as required thick. SA387 Gr11 alloy steel plate is an...
View Specification
ASTM A285 Boiler Vessel Plates
ASTM A285 Boiler Vessel Plates is supplied at 8mm-150mm or as required thick. ASTM A285 boiler vessel plate is a...
View Specification
CCS Grade A Ship Steel Plate
CCS Grade A Ship Steel Plate is supplied to ASTM DIN JIS GB. Our company supplies and sells CCS classification...
View Specification
ABS Grade Ship Steel Plate
ABS Grade Ship Steel Plate is supplied to ASTM DIN JIS GB. Our company supplies and sells ABS classification society...
View SpecificationQuality Inspection and Certification Questions
Do you accept inspection by our own agency?
Is the quality certificate charged for?
What happens to material that fails inspection?
Put Quality Inspection and Certification To Work On Your Next Order
Send the product name, the size and the quantity. Everything else is agreed before production is scheduled.