Solution
OEM Series Supply
Series production against a fixed specification and a fixed drawing.
Why This Exists
For equipment builders the requirement is not one bearing but the same bearing, to the same specification, order after order.
How It Works
Specification freeze
Material, precision class, clearance group, cage and marking are recorded as a controlled specification.
Production planning
Series quantities are scheduled against the release plan rather than quoted line by line.
Marking and packing to your standard
Neutral packing, your own carton marking or the AFA brand, in wood or paper boxes as required.
One document set
Bearings, seals and transmission parts can ship together on a single invoice and packing list.
Start With What You Have
A part number, a photograph or three measurements. Nothing else is needed to begin.
Answers



